Co-production
Engagement Overlay to the RIBA Plan of Work, published by the RIBA in January 2024, states:
Co-production (collective production, sometimes collective build) is to produce together where the project team and participants work together to physically produce and build a project, feature, or component actively using creative, participatory methods.
It involves a shift from a traditional, top-down design and build model to a more collaborative and participatory approach. The Co-production process aims to ensure that proposals are designed and delivered to meet the needs and preferences and that they are encouraged to shape the proposals actively. Co-production can occur at work stages 4 to 6, requiring process, training, budget, limitations, and governance confirmation. Links to levels of engagement: Co-production can enable participants and treat them equally as partners, leading to more collaborative outcomes.
[edit] Related articles on Designing Buildings
Featured articles and news
A detailed description fron the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.



















