Co-production
Engagement Overlay to the RIBA Plan of Work, published by the RIBA in January 2024, states:
Co-production (collective production, sometimes collective build) is to produce together where the project team and participants work together to physically produce and build a project, feature, or component actively using creative, participatory methods.
It involves a shift from a traditional, top-down design and build model to a more collaborative and participatory approach. The Co-production process aims to ensure that proposals are designed and delivered to meet the needs and preferences and that they are encouraged to shape the proposals actively. Co-production can occur at work stages 4 to 6, requiring process, training, budget, limitations, and governance confirmation. Links to levels of engagement: Co-production can enable participants and treat them equally as partners, leading to more collaborative outcomes.
[edit] Related articles on Designing Buildings
Featured articles and news
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.





















