CRC Energy Efficiency Scheme
The CRC Energy Efficiency Scheme was introduced in 2008 as the 'Carbon Reduction Commitment' (CRC). The Scheme itself began in April 2010 with the introduction of the CRC Energy Efficiency Scheme Order 2010. It forms part of the UK's commitment to reduce greenhouse gas emissions by at least 80% from 1990 levels by 2050.
The Scheme is slowly being phased in throughout the UK, and in England and Wales is being administered by the Environment Agency.
The Scheme aims to encourage energy efficiency and a reduction in carbon dioxide emissions in large public and private sector organisations. It does this by introducing financial and reputational incentives.
The Scheme covers large non-energy-intensive organisations within the UK's public and private sector such as:
- Supermarkets.
- Hotels.
- Water companies.
- Banks.
- Local authorities.
- Government departments.
These large non-energy-intensive organisations account for about 10 per cent of the UK’s carbon dioxide emissions.
The Scheme does not cover energy-intensive businesses such as power generation, cement, glass, pulp and paper industries which are already covered by other forms of emissions trading and climate change levy schemes.
Qualification for the scheme is based on the amount of electricity consumed by an organisation. Organisations that had at least one half hour meter in 2008 were required to make an information disclosure in 2010. Organisations with at least one half hour meter and whose electricity consumption was at least 6,000 MWh in 2008 are required to participate fully in the scheme.
Where businesses are part of a larger organisation, they must take part in the scheme together under their highest parent organisation.
Participating organisations are required to monitor and report their energy use each year and to purchase allowances equal to their annual emissions in tonnes of CO2 during each compliance year from 2011/12 onwards.
The total allowances cost for each year is calculated by multiplying by the quantity of CO2 emissions in tonnes, as submitted in the organisations annual report, by the cost per allowance set by HM Treasury. For 2011/12 and 2012/13, this will be £12 per tonne.
From 2013/14 it is intended that the total number of allowances will be capped, and that rather than being sold at a fixed price, allowances will be auctioned.
The scheme was originally intended to be revenue-neutral, meaning that all the money raised from selling allowances would be distributed back to participants, with the highest-ranking organisations in the league table receiving larger distributions. However in 2010, the government decided instead to retain the revenues generated. This resulted in considerable lobbying against the scheme, and a result, a consultation process is now underway to try to consider how the scheme might be simplified.
In the 2016 budget, it was announced the Carbon Reduction Commitment energy efficiency
scheme would be abolished and replaced, in a revenue neutral way, with an increase in the Climate Change Levy from 2019. This it was said was because the scheme had been 'bureaucratic and burdensome'.
[edit] Related articles on Designing Buildings Wiki
- 2016 budget.
- Carbon dioxide.
- Circular Construction in Regenerative Cities (CIRCuIT).
- Climate Change Act.
- Climate Change Levy.
- Emission rates.
- Energy Act.
- Energy certificates.
- Energy related products regulations.
- Energy targets.
- Government publishes 2021 guidance on carbon capture technologies.
- Green building.
- Green Deal.
- Sustainability.
- The Carbon Plan: Delivering our low carbon future.
- Zero carbon non-domestic buildings.
[edit] External references
- Environment Agency: CRC Energy Efficiency Scheme: Guidance for participants in Phase 1 (2010/11–2013/14)
- Business Link: CRC guide.
- Carbon Trust: CRC Energy Efficiency Scheme.
Featured articles and news
A case study and a warning to would-be developers
Creating four dwellings for people to come home to... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”