BROOF (t4)
BROOF(t4) refers to the highest fire rating classification for roofs according to the European classification system BS EN 13501-5 since the national classification system BS 476-3:2004 no longer applied after 2019 and the new Approved Regulations Part B. The test indicates that the roof system prevents fire penetration for at least 60 minutes resistance to external fire spread, penetration, and burning droplets and is essential for compliance in UK building regulations, often required for flat roofs, terraces, and high-rise developments.
- No penetration of roof system within 60 minutes
- In preliminary test, after withdrawal of the test flame, specimens burn for less than 5 minutes
- In preliminary test, flame spread less than 0.38 m across region of burning
[edit] Related articles on Designing Buildings
- Blue roof.
- Cold roof.
- Designing out fire risk in roof voids.
- Existing guidance on fire compartmentation in roof voids.
- Flat roof.
- Green roof.
- Metal roofing.
- Pitched roof.
- Shingle roofing.
- Slate roofing.
- Solar panels, pitched roofs and risk of fire spread.
- Tile roofing.
- Thatch roofing.
- Types of roof.
- Warm roof.
Featured articles and news
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.