ACM PE panels, ACM FR panels and other variations
ACM PE panels, is short for Aluminium composite material rainscreen panels with a polyethylene core. These are a relatively standard construction product with a long complex history, they also became infamous for their use on the Grenfell tower tragedy. For a detailed look at the developments and changes in their use, see the article ACM cladding.
ACM is a generic term for all types of cladding systems, which are essentially two or more layers of aluminium sandwiching and insulation product, of which there are many variations. Many consider a key element as being the type of insulant or core that is used, which is often (but not always) reflected in the product name. ACM PE; refers to the polyethylene core, ACM PUR; refers to a polyurethane core and ACM FR normally refers to a mineral filled thermoplastic. FR in this case perhaps less descriptive of the actual material make-up stands for Fire Resistance, which is generally achieved by using a mineral filler in the thermoplastic. Other ingredients might also be used in the make-up of the, often, predominantly thermoplastic material such as fire retardants, additives and thermoplastic modifications, all of which can impact both thermal and fire resistance properties.
Mineral or inorganic fillers for the thermoplastics used in ACM cores, fill cells in the thermoplastic helping to improving fire performance, however the percentage of mineral filler can vary from between 5-50%, in comparison with the percentage of thermoplastic, and the data relating to make-up is not always clearly stated.
Whilst the make up of the core can significantly alter the resistance to fire, the panels do primarily rely on the metallic skin to protect the inner core from weathering and from exposure to fire. ACM's are a popular product because of their preciseflatness, variety of surface finishes, colours, textures and so on, they are light weight and flexible. However, incorrect cutting, installation and location of firebreaks between the panels can expose the inner core from the sides or corners, impacting fire resistance, and during a fire, it is possible for the panels to delaminate, exposing the core material.
The University of Queensland, Australia have tested and studied a number of different cladding system and published their results in a library https://claddingmaterialslibrary.com. This library lists some 80 plus products that have been tested, many of which are ACM products, of the those products the library highlights slight variations in the make up of the differing products (even where the descriptive names such as ACM PE or ACM FR remain the same). Some of these are listed below, for further information and detailed results visit the library here:
- ACM with predominantly polyethylene core (ACM PE)
- ACM with predominantly polyethylene and a fire retardant (ACM PE)
- ACM with a mineral (or in organic material) filled thermoplastic core (type of thermoplastic used is often undefined) (ACM FR) FR standing for fire resistant.
- ACM with predominantly polyethylene modified with vinyl acetate (PE-VA)
- ACM with predominantly polyethylene modified with vinyl acetate (PE-VA), a fire retardant, and / or an inorganic filler.
- ACM with predominantly polyethylene (PE) with ethyl vinyl acetate (EVA) copolymer, a fire retardant, and an inorganic filler
Featured articles and news
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.
The benefits of engaging with insulation manufacturers
When considering ground floor constructions.
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.