User contributions
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
- 06:52, 6 February 2025 (diff | hist) N Airborne sound insulation (Created page with "Approved document E: Resistance to the passage of sound, 2003 edition incorporating 2004, 2010, 2013 and 2015 amendments, defines airborne sound as: ‘Sound propagating through ...") (top)
- 06:51, 6 February 2025 (diff | hist) N Absorptive material (Created page with "Approved document E: Resistance to the passage of sound, 2003 edition incorporating 2004, 2010, 2013 and 2015 amendments, defines an absorptive material as a: ‘Material that ab...") (top)
- 06:50, 6 February 2025 (diff | hist) N Absorption coefficient (Redirected page to Sound absorption coefficient) (top)
- 06:49, 6 February 2025 (diff | hist) Absorption (top)
- 07:14, 5 February 2025 (diff | hist) Vapour barrier (top)
- 07:13, 5 February 2025 (diff | hist) N Surface condensation (Created page with "Approved document C: Site preparation and resistance to contaminants and moisture, 2004 edition incorporating 2010 and 2013 amendments defines surface condensation as: ‘Deposit...") (top)
- 07:11, 5 February 2025 (diff | hist) Types of roof (top)
- 07:10, 5 February 2025 (diff | hist) Precipitation (top)
- 07:09, 5 February 2025 (diff | hist) Interstitial condensation (top)
- 07:07, 5 February 2025 (diff | hist) Groundwater (top)
- 07:05, 5 February 2025 (diff | hist) N Contaminant (Created page with "Approved document C: Site preparation and resistance to contaminants and moisture, 2004 edition incorporating 2010 and 2013 amendments defines contaminant as: ‘Any substance wh...")
- 07:04, 5 February 2025 (diff | hist) N Building and land associated with the building (Created page with "Approved document C: Site preparation and resistance to contaminants and moisture, 2004 edition incorporating 2010 and 2013 amendments defines building and land associated with t...") (top)
- 07:01, 5 February 2025 (diff | hist) N Spray (Created page with "In general terms, the word 'spray' refers to any liquid that is blown or driven through the air in the form of small droplets. Approved document C: Site preparation and resistan...") (top)
- 06:51, 5 February 2025 (diff | hist) N Solar shading device (Created page with "Approved document B: Fire Safety, Volume 2: Buildings other than dwellings, 2019 edition incorporating 2020 and 2022 amendments, defines a solar shading device as: ‘A device at...") (top)
- 06:45, 5 February 2025 (diff | hist) Supported wall (top)
- 06:44, 5 February 2025 (diff | hist) Span (top)
- 08:32, 4 February 2025 (diff | hist) Construction tolerances (top)
- 08:32, 4 February 2025 (diff | hist) Spacing (top)
- 08:31, 4 February 2025 (diff | hist) N Spacing (Created page with "In the UK construction industry, the term "spacing" has several meanings depending on the context in which it is used. It generally refers to the measured distance betw...")
- 08:28, 4 February 2025 (diff | hist) Separating wall
- 08:26, 4 February 2025 (diff | hist) N Cavity width (Created page with "Approved document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments, defines cavity width as: ‘The horizontal distance between the two leaves of a cavity ...") (top)
- 08:25, 4 February 2025 (diff | hist) N Approved document A: Structure (Redirected page to Approved Document A) (top)
- 08:24, 4 February 2025 (diff | hist) Wall types
- 08:23, 4 February 2025 (diff | hist) N Buttressing wall (Created page with "Approved document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments, defines a buttressing wall as: ‘A wall designed and constructed to afford lateral sup...") (top)
- 08:19, 4 February 2025 (diff | hist) N NANDO (Redirected page to New Approach Notified and Designated Organisations) (top)
- 08:17, 4 February 2025 (diff | hist) Mixed use development (top)
- 08:15, 4 February 2025 (diff | hist) N Mixed-use building (Redirected page to Mixed-use development)
- 08:14, 4 February 2025 (diff | hist) In-building physical infrastructure (top)
- 08:11, 4 February 2025 (diff | hist) N Public electronic communications network (Created page with "Approved Document R: Infrastructure for electronic communications, Volume 1: Physical infrastructure and network connection for new dwellings, 2022 edition, defines a public elec...") (top)
- 08:09, 4 February 2025 (diff | hist) N USO-standard public electronic communications network (Created page with "Approved Document R: Infrastructure for electronic communications, Volume 1: Physical infrastructure and network connection for new dwellings, 2022 edition, defines a public elec...") (top)
- 08:07, 4 February 2025 (diff | hist) Network termination point (top)
- 08:06, 4 February 2025 (diff | hist) N Network operator (Created page with "Approved Document R: Infrastructure for electronic communications, Volume 1: Physical infrastructure and network connection for new dwellings, 2022 edition, defines a network ope...") (top)
- 07:06, 4 February 2025 (diff | hist) Newsletter archive
- 07:05, 4 February 2025 (diff | hist) N File:Designing Buildings Newsletter 4 2 2025.pdf (Designing Buildings Newsletter 4 2 2025) (top)
- 06:54, 4 February 2025 (diff | hist) CIOB Northern Ireland inspires next generation of construction talent (top)
- 08:51, 3 February 2025 (diff | hist) Building Safety Wiki quick links (top)
- 08:49, 3 February 2025 (diff | hist) Building Safety regulations index
- 07:48, 3 February 2025 (diff | hist) High-speed electronic communications network (top)
- 07:47, 3 February 2025 (diff | hist) N Gigabit-ready physical infrastructure (Created page with "Approved Document R: Infrastructure for electronic communications, Volume 1: Physical infrastructure and network connection for new dwellings, 2022 edition, defines gigabit-ready...") (top)
- 07:45, 3 February 2025 (diff | hist) N Gigabit-capable public electronic communications network (Created page with "Approved Document R: Infrastructure for electronic communications, Volume 1: Physical infrastructure and network connection for new dwellings, 2022 edition, defines a gigabit-cap...") (top)
- 07:44, 3 February 2025 (diff | hist) Gigabit-capable electronic communications network (top)
- 07:43, 3 February 2025 (diff | hist) N Gigabit-capable electronic communications network (Created page with "Approved Document R: Infrastructure for electronic communications, Volume 1: Physical infrastructure and network connection for new dwellings, 2022 edition, defines gigabit-capab...")
- 07:41, 3 February 2025 (diff | hist) N Network distribution point (Redirected page to Distribution point) (top)
- 07:40, 3 February 2025 (diff | hist) N Distribution point (Created page with "Approved Document R: Infrastructure for electronic communications, Volume 1: Physical infrastructure and network connection for new dwellings, 2022 edition, defines a distributio...") (top)
- 07:39, 3 February 2025 (diff | hist) N Connectivity plan (Created page with "Approved Document R: Infrastructure for electronic communications, Volume 1: Physical infrastructure and network connection for new dwellings, 2022 edition, defines a connectivit...") (top)
- 07:36, 3 February 2025 (diff | hist) Access point (top)
- 07:32, 3 February 2025 (diff | hist) Secure doorset (top)
- 07:32, 3 February 2025 (diff | hist) N Secure doorset (Created page with "Approved Document Q, 2015 edition, defines a doorset as: ‘A complete door assembly, assembled on site or delivered as a completed assembly, consisting of the door frame, door l...")
- 07:30, 3 February 2025 (diff | hist) N Secure window (Created page with "Approved Document Q, 2015 edition, defines a secure window as: Either: * a window that is proven to resist criminal attack, or * a bespoke window incorporating construction fea...") (top)
- 07:28, 3 February 2025 (diff | hist) Coupled assembly (top)
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
















