Mistakes while doing Industrial Flooring.
- Weak Strength of concrete Floor- While doing Industrial flooring it is very import to have strength in flooring. PPC flooring is not good option for it. Tremix flooring is best option for Industrial flooring. Strength should be more than M20. Here M stands for Mix and Number for strength in N/mm2. Mixing ratio of M20 concrete is (1 Cement : 1.5 Sand : 3 Aggregates)
- Rough Finishing of Concrete Floor- Concrete flooring should have smooth finish. Rough floor can’t be clean easily. Dust and dart deposit in rough surfaces. It is very difficult to clan the floor. We can’t maintain hygienic condition in premises
- Undulation in Flooring- For easy material handling with trolley and fork lift, floor must be plan. Also floor gets easily damaged due to undulation in floor.
- No groove in floor- This is also one of the mistake many people do. When we lay a concrete floor. Floor starts doing movement of contraction and expansion. This, movement create crack in floor. To avoid create generation in flooring we must have to do groove cutting on 3 meter by 3 meter size square.
- Not doing Epoxy Flooring-It is very import to do Epoxy Flooring. Epoxy is an adhesive which has 3 times more strength than concrete floor. It’s come in many colors. It is smooth having anti microbial property.
Benefits of doing Epoxy Flooring-
- It protects concrete
- It makes easy material handling
- Easy cleaning so help to maintain hygienic condition
- Aesthetic look
- Increase lighting effects.
For more details visit https://anantepoxyflooring.in
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.


















Comments
https://www.designingbuildings.co.uk/wiki/Marketing_opportunities_on_Designing_Buildings
https://www.designingbuildings.co.uk/wiki/Editorial_policy
https://www.designingbuildings.co.uk/wiki/Page_about_me