Counterbore
A counterbore, might be called a countersink (which also used to describe the tool designed to make a counterbore), is where a second drill hole is made after a pre-drill hole or bore (for a screw length), this is normally only a partial drill hole and usually with angle edges. It is made to allow the head of the screw to sink into the wood or metal further so that the screw or bolt head lies flush with the surface of the wood or metal being fixed.
[edit] Related articles on Designing Buildings
- Carpentry.
- Facts about forestry.
- Janka hardness rating scale.
- Nails - a brief history.
- Sustainable timber.
- Staircase.
- The differences between hardwood and softwood.
- The use of timber in construction.
- Timber.
- Timber vs wood.
- Types of timber.
- Types of timber species.
- Whole life carbon assessment of timber.
- Wood around the world.
Featured articles and news
Our next guest editor Christine Peever
Practising Architect and Director of Sheldon Peever Studio.
Biodiversity net gain, tips and tools for small sites
How to deal with BNG when options become limited.
Registered building inspectors
Building types and conflicts of interest updates explained.
A brief run-down reminder of key points to note.
New electrical apprentice rates
Fair pay for much needed pipeline of electrical apprentices.
BSRIA's commitment to sustainability and net zero
Key documents that represent an early shift in thinking.
A resource for Cleaner Air, Better Tomorrow.
Awe-inspiring medieval great barns.
A history of timber construction in the UK
From a timber Stonehenge to half timber houses.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.