Workplace drug testing methods
Testing for drug use on construction sites and in the workplace is intended to protect people and premises while ensuring that an employer’s responsibilities under the Health and Safety at Work Act have been met. There are several different testing methods, each with their own benefits.
When selecting a testing programme, employers can evaluate the answers to several questions, including:
- Is saliva testing a viable option? In environments where safety and timing are priorities, saliva testing may be preferred, since it can determine if someone is currently under the influence of drugs. Saliva testing can produce a positive result if the individual had taken drugs in the last two hours. Saliva testing is generally not prone to contamination.
- Is urine testing a viable option? While saliva testing may be suitable for some sensitive environments, urine testing may be suitable in instances where random testing policies are in place. This method can provide instant, in-house results that may be able to prevent accidents from happening on site in the first place. However, urine testing may not provide reliable results in instances where very recent substance activity has occurred - or if the test participant is under the influence at the time the sample was taken. Generally, urine tests are unable to detect drugs that have been taken in the 48 hour time period immediately prior to the test.
- What is the test’s cut-off level for each drug? This factor establishes how much of a drug can be present in a person’s system before its presence is detected by the test. If this level is low, the kit will be more sensitive to a positive result.
[edit] Related articles on Designing Buildings
Featured articles and news
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.