Kanban
Contents |
[edit] Introduction
Kanban is a project management technique that uses tools such as billboards or signs to document and streamline the various steps in processes. This scheduling system uses the visual indicators (which can be either physical or digital) to identify and prioritise demands and then realistically assign resources.
[edit] History
Kanban is the Japanese word for billboard. The kanban method of project management came as a byproduct of Toyota’s just in time manufacturing approach introduced in the 1940s.
Kanban became popular in the 21st century as a computer software development method. Since the middle 2000s, it has also been applied to wider types of project management, including construction.
Some of the early thought leaders and authors in kanban are:
- David Anderson
- Jim Benson
- Mike Burrows
- Eric Brechner
- Tonianne DeMaria
- Siegfried Kaltenecker
- Corey Ladas
- Klaus Leopold
- Don Reinertsen
[edit] Applying kanban
Kanban is based on six practices:
- Visualise work.
- Limit work in progress.
- Make policies explicit.
- Manage flow.
- Implement feedback loops.
- Improve collaboratively and evolve experimentally.
Kanban is a collaborative form of continuous improvement. It is not meant to overturn ongoing project management methods and can be implemented in conjunction with existing strategies. It can also be introduced incrementally, so it does not cause disruption.
[edit] Kanban and construction
In construction applications, kanban can be used effectively with suppliers to manage resources. Kanban boards can also be used to visualise stages of work processes and identify potential problem areas.
NB The Chartered Institute of Procurement & Supply (CIPS) Glossary of procurement terms, defines Kanban as: ‘A production method where instructions are sent from one operation to the next on a card, including specific items and quantities. (Translated from the Japanese, it literally means ‘signboard’ or ‘billboard’). The aim is to reduce waste through over-production.’
The Practical Adoption of Agile Methodologies, APM Volunteer Research report, published by the Association for Project Management (APM) in May 2015, states: ‘Kanban is a method for managing knowledge work with an emphasis on just-in-time delivery while not overloading the team members. In this approach, the process, from definition of a task to its delivery to the customer, is displayed for participants to see and team members pull work from a queue’.
The Association for Project Management (APM) Agile Glossary defines kanban as: ‘a method for managing work, with an emphasis on just-in-time delivery.’ It defines a kanban board as: ‘a work and workflow visualisation tool which summarises the status, progress, and issues related to the work.’
[edit] Related articles on Designing Buildings
Featured articles and news
Latest Build UK Building Safety Regime explainer published
Key elements in one short, now updated document.
UKGBC launch the UK Climate Resilience Roadmap
First guidance of its kind on direct climate impacts for the built environment and how it can adapt.
CLC Health, Safety and Wellbeing Strategy 2025
Launched by the Minister for Industry to look at fatalities on site, improving mental health and other issues.
One of the most impressive Victorian architects. Book review.
Common Assessment Standard now with building safety
New CAS update now includes mandatory building safety questions.
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.