JCT Sub-subcontract
The Joint Contracts Tribunal (JCT) was formed by the Royal Institute of British Architects (RIBA) in 1931 when the first JCT standard form of building contract was issued. It now produces a range of standard forms of contract for the construction of buildings accompanied by guidance notes and other standard forms of documentation.
As buildings have become increasingly complicated, so it is less and less likely that any one contractor will have the required skills to carry out all of the works necessary to construct them. As a result, a supply chain is likely to be created, consisting of an interconnected hierarchy of supply contracts that together will carry out the works.
A subcontract is an agreement between the main contractor and an organisation or individual to perform a portion of the works for which the main contractor was contracted.
A sub-subcontract is an agreement between a subcontractor and an organisation or individual to perform a portion of the works for which the subcontractor was contracted.
The JCT Sub-subcontract (SubSub) is designed for use on sub-subcontract works where the main contract is a JCT contract and sub-contracts are one or more of the JCT sub-contracts.
It can be used on a standard sub-contract, and also where the works (sub-subcontract or sub-contract) are intended to be carried out in sections. The works can be based on remeasurement or on an adjusted sub-subcontract sum. It is not suitable where the works are of a complex technical nature, or if they require full back-to-back provisions with the sub-contract.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.