Cable net structure
A cable net structure is an example of a tensile structure, i.e. a structure that is stabilised by tension rather than compression. For example, a piece of fabric pulled in opposite directions. For more information see: Tensile structures.
Cable nets were developed and popularised as a minimalist structural system in the 1960s and 70s by Frei Otto, with a new permanence was heralded by the plexi glass clad cable net of the 1972 Munich Olympic Stadium. For more information see: Frei Otto.
The architect Helmut Jahn is often credited with using the system in the most innovative application, when designing the Kempinski Hotel, Munich, in the early-1990s. Jahn adopted the cable net system, creating a structural form of pre-tensioned cables to provide support for a sheer glass curtain wall.
To increase height and load capabilities, horizontal cables can be combined with vertical cable arrangements. By doing so, system designs can be developed for double curvature walls as well as flat walls. For more information see: Anticlastic and Synclastic.
Cable nets are capable of being very simplistic structures. The clean aesthetic and large-spanning potential can be integrated with adjacent structures to reduce the need for conventional supports.
Typically, the cables are locked together at their intersections using a clamping component which may also fix any cladding to the net. Complex hydraulic jacking processes may then be used to apply the cable prestress.
Millennium Dome, London, During Construction. |
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.