Self-certification is the ability to verify (without recourse to third parties) that a process, service undertaken or product manufactured by an entity has been certified by the entity as complying with certain standards.
[edit] Self-certification in construction
In construction, self-certification relies on the principle of 'trust and confirm' for both a client and supplier. It relies on the client putting in place a management system that includes an assurance overview that provides an insight into the correct completion of the works. It also relies on the supplier implementing a system for the provision of evidence at points throughout the works as part of their management arrangements. This could include a job-centric form of checklist, such as an inspection and test plan, that will be used to record the progress of the works. Once the works are complete, a certificate is signed by both parties to agree that the works have been completed to the desired standard.
Self-certification relies on a high level of trust between the client and supplier. The client is passing the responsibility for the standard of the works to the supplier, and not re-examining them in detail at every point. This reduces the amount of duplication of tests and inspections.
Where a collaborative relationship has been formally set in place, a relationship management plan can help. Information about collaborative working and the preparation of relationship management plans can be found in international specification ISO 44001: 2017 'Collaborative business relationship management systems – requirements and framework'. Typically, they follow the life of a relationship from deciding with whom to collaborate, through setting up the relationship through to providing a soft landing when the relationship comes to an end.
At a witness point, the supplier is confirming that the work since the last test or inspection has been successfully completed. The client may accept this with or without attending or examining records, although only the supplier will have signed the item off.
At a hold point, the client will attend the test or inspection and will confirm that the records created at the witness points following the last hold point are valid and that the works conform to the appropriate standard(s). Both parties normally sign the hold point off to permit work to continue into the next stage.
[edit] Other types of self-certification
[edit] Building regulations
The Building Act also allows individuals and organisations that are considered sufficiently competent, to join a competent persons scheme, and then to self-certify that their work has been carried out in compliance with the building regulations and to issue a certificate to the client. Their ability to self-certify is limited to those areas of the works in which they are considered sufficiently competent.
For more information see: Competent person schemes.
[edit] Finance
Self-certification can be a very loose process and, in many cases, not follow a prescribed format. For example, it may form part of opening an account where a reporting financial institution can determine an account holder’s residence(s) for tax purposes, and whether they are a citizen, based on the information obtained by the institution in connection with the opening of the account.
[edit] Employee sickness
Because doctors no longer issue ‘sick notes’ to justify short work absences, many firms operate their own self-certification scheme. This involves the employee completing a form in the presence of managers and countersigned by them if they are satisfied with the employee’s declaration. During the process, employees are questioned about the illness or injury. Employers may also make the employee undergo an independent medical examination.
[edit] Related articles on Designing Buildings Wiki
- Approved inspector.
- Assurance and self-certification.
- Certify.
- Competent person schemes.
- Design: a quality management perspective.
- Design freeze: a quality perspective.
- How to check certification.
- How to write an inspection and test plan.
- Change control: a quality perspective.
- Mobilisation to site: a quality perspective.
- Plan, Do, Check, Act (PDCA).
- Why should quality be important to the construction industry?
Featured articles and news
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.