Selection criteria
Selection criteria (sometimes referred to as award criteria or evaluation criteria) are lists of items against which a prospective supplier can be assessed before a selection is made and a contract awarded. They might also be used to help identify suitable individuals when seeking new employees.
Defining specific selection criteria can help an employer agree among themselves the characteristics that they value. This helps ensure they identify the best value submission, rather than simply the lowest price submission. When the employer is evaluating submissions, referring to the selection criteria, or perhaps even giving marks against each criteria can help focus the assessment and prevent it being dominated by personal preferences or by forceful individuals.
Informing applicants what the selection criteria are can create a fairer process, enabling applicants to consider in advance whether they are suitable, and helping them tailor their submissions. It also makes the application process more transparent and so less open to challenge.
Assessment criteria will vary significantly depending on the nature of the role; whether it is for a consultant, contractor, other supplier or employee, however, some typical criteria might include:
- Price.
- Relevant experience.
- Understanding of the requirements.
- Past performance.
- Technical skills.
- Availability.
- Management skills.
- Proposed methodology.
- Compliance with the requirements of the submission process.
- Financial standing.
The criteria may be weighted to reflect how important they are to the client. Each submission is then given a score against each criteria. Submissions might be scored by a number of assessors, or different assessor might score different criteria.
The overall score for a submission can be calculated by multiplying the score for each criteria by its weighting and then adding together or averaging the results for each assessor. Where there are very different scores between assessors, a meeting might be held to discuss the reasons.
More complex assessments might include additional benchmarks. For example, there may be certain criteria that are straight-forward pass/fail issues. There may also be criteria for which a very low rating is unacceptable irrespective of scores for other criteria.
[edit] Related articles on Designing Buildings Wiki
- Accelerated debrief.
- Adversarial behaviour in the UK construction industry.
- Appointing consultants.
- Auction theory.
- Best value.
- Best value procurement.
- Bid evaluation.
- Competitive procedure with negotiation.
- Due diligence when selecting contractors or subcontractors.
- Innovative partnership procedure.
- Invitation to tender.
- Most Economically Advantageous Tender (MEAT).
- Pre qualification questionnaire.
- Procurement route.
- Tender evaluation.
- Tender price appraisal.
- The benefits of e-procurement in construction.
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.