Rules of Thumb - Guidelines for building services (5th Edition) (BG 9/2011) was written by Glen Hawkins and published by BSRIA (Building Services Research and Information Association) in April 2011.
The book is a valuable source of engineering design, environmental performance and project cost data for building services projects.
[edit] Update for 2023
BG 9/2011 Rules of Thumb is one of BSRIA’s best-selling publications, providing useful data to help inform early stages of design. However, it is now 12 years old, so it might not meet the needs of the modern industry and some data may be out of date. BSRIA have just started a project to replace Rules of Thumb with a number of smaller publications with updated content. These are expected to be published later in 2023.
A major part of this project will involve consulting with the industry about the content of the new guides – what needs updating, what could be added or removed, and how it can be made more user-friendly. If you would like to take part in this consultation, please start by completing this short questionnaire. Your responses are highly confidential and we will then be in touch for further information. If you have any questions about this project, or would like updates on progress, please contact BSRIA’s publications manager David Bleicher.
BSRIA Questionnaire - Rules of Thumb replacement publications here.
[edit] About the previous edition
The rules of thumb provided are general principles derived from practice and experience. They have been created by referencing a range of contemporary sources and reflect current design practice. They can be useful in the early stages of design, such as briefing, feasibility studies and early concept design, helping assess:
- Space and weight requirements.
- Outline costs.
- Environmental performance targets.
- Heating, cooling and electrical loads.
They can also be used in later stages to ‘sense check’ detailed calculations and assess ‘what if’ scenarios.
The latest edition has been updated and expanded to provide more detailed information, including:
- More guidance about space and weight allowances.
- CO2 emissions benchmarks.
- Clearer guidance about costs, expanded to include energy consumption, maintenance, operation and life cycle cost information.
- A system features section, subdivided into mechanical and electrical systems.
- Guidance about compliance with Part L of the Building Regulations, renewable technologies and air permeability requirements.
The book is subdivided into 7 colour-coded sections:
- Space and weight.
- System features – mechanical building services, electrical building services and natural ventilation.
- Cooling, heating and electrical loads.
- Water consumption.
- Internal and external design criteria.
- Costs.
--BSRIA
[edit] Related articles on Designing Buildings
- Approved document L.
- Benchmarking.
- Blue book.
- BSRIA articles on Designing Buildings Wiki.
- BSRIA.
- Building regulations.
- Building services.
- Building services engineer.
- Confirming knowledge of building services.
- Cooling.
- Cost planning.
- Heating ventilation and air conditioning.
- Heating.
- Types of building services.
- Ventilation.
Featured articles and news
Specifying XPS in masonry cavity walls below DPC level
Moisture requirements, DPCs and third party certification.
Types of rigid foam insulation
A brief description and some of the main construction types.
Metal composite material panel systems MCM and MCP
Sandwich finishes, forms, details, core and their impacts.
Cumbria's vernacular architecture
A history of building impeded by unsettled times.
CIOB and MMC Ireland announce strategic partnership
For better working conditions, and a more productive construction sector.
More than just glass.
Grenfell Phase 2 final report for construction, at a glance
Twenty-three key issues raised and their recommendations.
Industry responds to the final Grenfell inquiry phase 2 report
Construction body responses to the long-awaited 7 volumes.
Chief construction advisers in brief
From July 2008 to November 2015.
The Grenfell phase 2 final report key summary points
And recommendations for the construction industry.
Approved Document B: Fire Safety upcoming updates
Including sprinklers in care homes, National classes and Fire resistance.
CIOB Podcast: 21st Century Construction
Catch up on the many previous episodes.
Tools and processes supporting a robust golden thread
BSRIA Handover Information and O&M Manuals guidance.
Industry survey highlights persistent skills gap
Building engineering business survey by ECA in partnership with BESA, SELECT and SNIPEF.
IHBC Conservation Professional Practice Principles
Spotlighted in HEF Historic Environment Overview.
CIAT collaborates with CIOB, CIfA, Icon to launch The Arc
Helping clients find specialist historic environment professionals.
Government building safety remediation data releases
Show some progress, but a 50% gap not yet started.
Testing For A Safer Future; an initial industry response
A response to the Independent Review of the Construction Product Testing Regime.
Requirements for UK buildings in certain circumstances.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.