Rules of Thumb - Guidelines for building services
NB in 2024, BSRIA announced that BG 9/2011 Rules of Thumb 5th Edition would be replaced by:
- BG 85/2024 Mechanical Criteria
- BG 86/2024 Electrical Criteria
- BG 87/2024 Useful Information Guide
- Space and Weight Allowances BG84 2024
Rules of Thumb - Guidelines for building services (5th Edition) (BG 9/2011) was written by Glen Hawkins and published by BSRIA (Building Services Research and Information Association) in April 2011.
The book is a valuable source of engineering design, environmental performance and project cost data for building services projects.
[edit] Update for 2023
BG 9/2011 Rules of Thumb is one of BSRIA’s best-selling publications, providing useful data to help inform early stages of design. However, it is now 12 years old, so it might not meet the needs of the modern industry and some data may be out of date. BSRIA have just started a project to replace Rules of Thumb with a number of smaller publications with updated content. These are expected to be published later in 2023.
A major part of this project will involve consulting with the industry about the content of the new guides – what needs updating, what could be added or removed, and how it can be made more user-friendly. If you would like to take part in this consultation, please start by completing this short questionnaire. Your responses are highly confidential and we will then be in touch for further information. If you have any questions about this project, or would like updates on progress, please contact BSRIA’s publications manager David Bleicher.
BSRIA Questionnaire - Rules of Thumb replacement publications here.
[edit] About the previous edition
The rules of thumb provided are general principles derived from practice and experience. They have been created by referencing a range of contemporary sources and reflect current design practice. They can be useful in the early stages of design, such as briefing, feasibility studies and early concept design, helping assess:
- Space and weight requirements.
- Outline costs.
- Environmental performance targets.
- Heating, cooling and electrical loads.
They can also be used in later stages to ‘sense check’ detailed calculations and assess ‘what if’ scenarios.
The latest edition has been updated and expanded to provide more detailed information, including:
- More guidance about space and weight allowances.
- CO2 emissions benchmarks.
- Clearer guidance about costs, expanded to include energy consumption, maintenance, operation and life cycle cost information.
- A system features section, subdivided into mechanical and electrical systems.
- Guidance about compliance with Part L of the Building Regulations, renewable technologies and air permeability requirements.
The book is subdivided into 7 colour-coded sections:
- Space and weight.
- System features – mechanical building services, electrical building services and natural ventilation.
- Cooling, heating and electrical loads.
- Water consumption.
- Internal and external design criteria.
- Costs.
--BSRIA
[edit] Related articles on Designing Buildings
- Approved document L.
- Benchmarking.
- Blue book.
- BSRIA articles on Designing Buildings Wiki.
- BSRIA.
- Building regulations.
- Building services.
- Building services engineer.
- Confirming knowledge of building services.
- Cooling.
- Cost planning.
- Heating ventilation and air conditioning.
- Heating.
- Types of building services.
- Ventilation.
Featured articles and news
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Conservation in the age of the fourth (digital) industrial revolution.
Shaping the future of heritage
Embracing the evolution of economic thinking.
Ministers to unleash biggest building boom in half a century
50 major infrastructure projects, 5 billion for housing and 1.5 million homes.
RIBA Principal Designer Practice Note published
With key descriptions, best practice examples and FAQs, with supporting template resources.
Electrical businesses brace for project delays in 2025
BEB survey reveals over half worried about impact of delays.
Accelerating the remediation of buildings with unsafe cladding in England
The government publishes its Remediation Acceleration Plan.
Airtightness in raised access plenum floors
New testing guidance from BSRIA out now.
Picking up the hard hat on site or not
Common factors preventing workers using head protection and how to solve them.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.