Rising main
A "rising main" is a vertical pipeline or pipework that carries water or other fluids under pressure upwards from a lower to a higher level. It might be used for:
- Water supply, in multi-story buildings, transporting potable water from a ground-level pump or main supply up to higher floors usually to a water cistern in the roof. This ensures that water pressure is maintained across all levels of the building.
- Pumping wastewater or sewage uphill from a low-lying area to a treatment facility or sewer system. This is particularly useful where gravity-based systems are not feasible due to topography.
- Fire protection, (sometimes called a dry riser or wet riser) where a vertical pipe allows water to be quickly delivered to various floors in case of fire. Dry risers are kept empty but can be charged with water by the fire brigade, while wet risers are kept full of water for immediate use.
Planning Gateway One - Glossary, published on the Planning Portal, defines a rising main/falling main as a: ‘Vertical pipe installed in high buildings for the supply of water for firefighting’
[edit] Related articles on Designing Buildings
Featured articles and news
One of the most impressive Victorian architects. Book review.
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.