Project directory
A project directory provides details of the organisations involved in a design and construction project. This may include their role, organisation name, address, phone numbers, email addresses and names of key contacts.
This is an important document that should be established as soon as appointments are made, and will develop as the project progresses and there are new appointments.
In the first instance, a project directory might be included in the project brief and may contain blanks were appointments have still to be made. As it develops it may go on to form a part of, or be referenced in; the project execution plan, pre-construction information, the construction phase plan, the contractor’s project handbook and so on.
At different stages of the project it may include details project team members including the:
- Client.
- Project manager / employers representative / employers agent.
- Principal designer.
- Consultant team
- Principal contractor.
- Subcontractors.
- Suppliers.
It may also include specific details of the roles and responsibilities of the site team, such as security operatives, health and safety officer and so on, and might include details for neighbours and key stakeholders.
It is important that the project directory is kept up to date, that responsibility for its preparation is allocated to a specific individual and that there is strict control of its distribution. Clearly without proper control and procedures in place, there is a danger that there will be different versions of the project directory and that confusion will occur, particularly, for example if one organisation, such as the contractor develops their own project directory, as their requirements may be different from those of the client or consultants.
The Construction (Design and Management) Regulations (CDM Regulations) 2015 require that the construction phase plan includes “details of key members of the project team”. The 2007 regulations required that pre-construction information included “details of client, designers, CDM co-ordinator (no longer required) and other consultants”, and whilst this is not a specific requirement of CDM 2015, it is difficult to see how duty holders could properly perform their duties without access to information identifying key project team members.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.