Project directory
A project directory provides details of the organisations involved in a design and construction project. This may include their role, organisation name, address, phone numbers, email addresses and names of key contacts.
This is an important document that should be established as soon as appointments are made, and will develop as the project progresses and there are new appointments.
In the first instance, a project directory might be included in the project brief and may contain blanks were appointments have still to be made. As it develops it may go on to form a part of, or be referenced in; the project execution plan, pre-construction information, the construction phase plan, the contractor’s project handbook and so on.
At different stages of the project it may include details project team members including the:
- Client.
- Project manager / employers representative / employers agent.
- Principal designer.
- Consultant team
- Principal contractor.
- Subcontractors.
- Suppliers.
It may also include specific details of the roles and responsibilities of the site team, such as security operatives, health and safety officer and so on, and might include details for neighbours and key stakeholders.
It is important that the project directory is kept up to date, that responsibility for its preparation is allocated to a specific individual and that there is strict control of its distribution. Clearly without proper control and procedures in place, there is a danger that there will be different versions of the project directory and that confusion will occur, particularly, for example if one organisation, such as the contractor develops their own project directory, as their requirements may be different from those of the client or consultants.
The Construction (Design and Management) Regulations (CDM Regulations) 2015 require that the construction phase plan includes “details of key members of the project team”. The 2007 regulations required that pre-construction information included “details of client, designers, CDM co-ordinator (no longer required) and other consultants”, and whilst this is not a specific requirement of CDM 2015, it is difficult to see how duty holders could properly perform their duties without access to information identifying key project team members.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
An extraordinary record of steel engineering worldwide.
Households living near new pylons to save on bills.
ECA warns growth must not outpace grid capacity or skills.
The role of the client and decision making
CIOB response to built environment professions call for evidence.
Construction's sustainability reporting revolution
Tracking upfront embodied carbon with digital tools.
ECA welcomes procurement reforms
Public spending must back British jobs and skills.
Campaigning for Edinburgh: the Cockburn Association 1875-2049
The role of the civic voice in protecting character. Book review.
CIOB photography competition is open for entries.
ECA Edmundson apprentice of the year award
Finalists announced.
Major new study exposes serious knowledge gaps.
Generating energy from internal light as well as sunshine.
ECA welcomes plans to strengthen subcontractor quality control.