Fabricated drainage stacks
With more pressure being placed on them, M&E consultants and contracts have to ensure that the systems they specify and install are able to stand up to the long-term tests they’re faced with. With this in mind, many consultants and contractors are turning to accredited systems to ensure both their longevity and sustainability.
Some manufacturers, such as Polypipe Terrain, offer fabricated drainage stacks boasting BES6001 accreditation. This means that the products are not only traceable through the entire supply chain, but they also encourage contractors to think responsibly too. By using systems manufactured off-site which are delivered ready to install, waste and carbon emissions can be kept to a minimum.
Aside from being more sustainable, fabricated drainage stacks are manufactured in a controlled factory setting, reducing the health and safety risks associated with drainage systems which are jointed on-site. Additionally, every drainage stack is air tested as standard, instilling confidence in the entire supply chain that the systems will stand the test of time.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.
A brief run down of changes intentions from April in an onwards.






















