Predicted Energy Assessment (PEA)
A Predicted Energy Assessment (PEA is normally required when selling a property prior to its construction, often called an off-plan sale. A PEA is a predicted version of the Standard Assessment Procedure (SAP) investigating its thermal efficiency and its environmental Impact (CO2) and is based on the same SAP calculations required at design stage.
The SAP calculation forms the basis of the Energy Performance Certificate (EPC) which is required for both domestic and commercial buildings when the existing building is being rented or sold. The Predicted Energy Assessment (PEA) is in effect the same approach but for buildings not yet built, it needs to be produced during the design phase of the project, submitted along with the final SAP calculation and carried out by a qualified On Construction Domestic Energy Assessor (OCDEA), given accreditation by the government.
Predicted Energy Assessments fall under The Home Information Pack Regulations 2007; UK Statutory Instruments 2007 No. 992 described under schedule 3:
"A predicted energy assessment must—
- (a) display prominently the title “Predicted Energy Assessment”;
- (b )contain the following statement—
“This document is a Predicted Energy Assessment required to be included in a Home Information Pack for properties marketed when they are incomplete. It includes a predicted energy rating which might not represent the final energy rating of the property on completion. Once the property is completed, the Pack should be updated to include information about the energy performance of the completed property.”
- (c) contain the address or proposed address (which may include a plot number) of the property;
- (d) be compiled otherwise than by a visual inspection of the property;
- (e) contain the predicted asset rating of the building—
- (i) based on its plans and specifications; and
- (ii )expressed in a way approved by the Secretary of State under regulation 17A of the Building Regulations 2000; and
- (f) contain an explanation of that predicted asset rating."
[edit] Related articles on Designing Buildings
- Building Performance Evaluation.
- Display Energy Certificate.
- Domestic Energy Assessor.
- Energy Performance Certificate.
- Energy Assessment.
- Energy Audit.
- Energy Savings Opportunity Scheme.
- Energy Performance of Buildings Directive.
- Energy Performance of Buildings Regulations.
- Post Occupancy Evaluation.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.
























