OSM sub-assemblies and components
Offsite residential construction, Glossary of terms, published by Buildoffsite in 2018, states in relation to OSM (off site manufacturing) sub-assemblies and components: ‘This category is intended to encompass approaches that are not classified as systemic OSM, but use several factory fabricated innovative sub-assemblies or components in an otherwise traditionally-built structural fabric. Typically, schemes incorporating the use of small volumetric units such as pre-assembled bathrooms (often known as pods, see Hybrid), floor or roof cassettes, spandrel panels, pre-cast concrete foundation assemblies, pre-formed wiring looms, mechanical engineering composites, pre-assembled facades etc would fall into this category. Cavity masonry constructed schemes using manufactured units, such as windows, doorsets, roof trusses etc that might otherwise be part of the fabrication process in the other OSM categories – should not be included as sub-assemblies or components in this category.’
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIAT reflects on the party conferences.
CIOB announce the winners of the Art of Building photography competition.
National Scheme of Delegation introduced.
The cost of employing people remains a concern.
Code of Practice for Electrical Energy Storage Systems.
ECA calls on members to comment on draft 4th edition.
Bringing together expertise and creating cultural benefits.
CIOB celebrates positive Ofsted report.
The Building Safety Regulator announces a call for evidence.
Government approach could undermine delivery and regeneration.
World's first mass timber data centre.
The overlooked environmental aspect of data centre development.
Introduction to radon awareness
New technical information sheet published by CIOB.
Updated supplier guide can help electrical contractors engage with NHP.
















