OSM sub-assemblies and components
Offsite residential construction, Glossary of terms, published by Buildoffsite in 2018, states in relation to OSM (off site manufacturing) sub-assemblies and components: ‘This category is intended to encompass approaches that are not classified as systemic OSM, but use several factory fabricated innovative sub-assemblies or components in an otherwise traditionally-built structural fabric. Typically, schemes incorporating the use of small volumetric units such as pre-assembled bathrooms (often known as pods, see Hybrid), floor or roof cassettes, spandrel panels, pre-cast concrete foundation assemblies, pre-formed wiring looms, mechanical engineering composites, pre-assembled facades etc would fall into this category. Cavity masonry constructed schemes using manufactured units, such as windows, doorsets, roof trusses etc that might otherwise be part of the fabrication process in the other OSM categories – should not be included as sub-assemblies or components in this category.’
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.
















