Non-material breach
A non-material breach (also known as a minor breach or trivial breach) refers to a violation of a contract that does not significantly affect the overall purpose or outcome of the agreement. Unlike a material breach, a non-material breach is less severe and does not undermine the fundamental aspects of the contract. As a result, the non-breaching party generally does not have the right to terminate the contract but may still be entitled to seek remedies, usually in the form of damages.
A non-material breach does not substantially affect the project or the benefits the non-breaching party expected to receive. It might involve a minor deviation from the contract terms, but it does not prevent the overall fulfilment of the contract's purpose. Non-material breaches are often correctable or can be addressed without significant disruption to the project. The breaching party may be required to fix the issue, but the contract typically continues as planned.
In the case of a non-material breach, the non-breaching party cannot terminate the contract based solely on this breach. Instead, they might seek compensation or require the breach to be remedied.
Examples of non-material breaches might include:
- A slight delay in completing a specific task that does not affect the overall project timeline or cause significant inconvenience could be considered a non-material breach.
- If a contractor installs materials that are slightly different in appearance from those specified but still meet the required quality and functionality standards, this could be a non-material breach. The issue might be easily rectifiable or negligible in its impact on the project.
- A minor administrative error, such as incorrect documentation that doesn't affect the actual work or payment processes, might be classified as a non-material breach.
- If a contractor uses an alternative material that is of equivalent quality and performance to the one specified, without prior approval but without negatively affecting the project, it might be considered a non-material breach.
The non-breaching party can seek to have the breach corrected, and they may also claim damages if the breach has caused any financial loss or inconvenience. However, these damages are typically limited to the extent of the actual impact of the breach. The contract remains in force despite the non-material breach, and both parties are expected to continue fulfilling their obligations.
Whether a breach is considered material or non-material often depends on the specific circumstances and the terms of the contract. Courts will assess the significance of the breach in relation to the overall contract.
[edit] Related articles on Designing Buildings
Featured articles and news
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.
The benefits of engaging with insulation manufacturers
When considering ground floor constructions.
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.
BSRIA Sentinel Clerk of Works Training Case Study
Strengthening expertise to enhance service delivery with integrated cutting-edge industry knowledge.
Impact report from the Supply Chain Sustainability School
Free sustainability skills, training and support delivered to thousands of UK companies to help cut carbon.
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.