Meaning of quantum meruit
Quantum meruit is a Latin term meaning ‘the amount deserved’ or ‘what the job is worth’. It is used to refer to a claim for a reasonable sum, such as when a contractor seeks payment for work which has not been determined by a contract. If there is a contract that entitles one party to receive an agreed or reasonable sum from the other then the law of contract applies and a claim for quantum meruit cannot be used.
A claim may arise in circumstances, including:
- Where there is a quasi-contract (e.g. where some contractual terms have been agreed but price has not).
- Where no price has been fixed.
- Where there is work done that falls outside the contract.
- Where there is work done under a void or unenforceable contract.
The contractor must demonstrate that the employer requested, either expressly or impliedly, the work to be done, or freely accepted it. However, in practice, it can prove difficult for the contractor to prove the exact amount of their entitlement under the principle of quantum meruit.
There are no stipulations as to how the reasonable sum is to be assessed as circumstances often differ. The assessment of a claim for quantum meruit in the absence of a contract will differ from the assessment of a reasonable sum to be paid within a contractual framework. Where work done outside an existing contract gives rise to a quantum meruit claim, the contractor should be paid at a fair commercial rate rather than as though it had been performed under the contract (which may be a different rate).
Evidence that can prove useful to a claim includes:
- Any abortive negotiations relating to price.
- The prices in a related contract.
- Calculations based on the net cost of labour and materials.
- Expert opinions regarding what constitutes a reasonable sum.
[edit] Related articles on Designing Buildings Wiki
- Construction contract.
- Contract conditions.
- Contract law.
- Contract sum.
- Defined cost.
- Difference between lump sum and measurement contracts.
- Disallowed cost.
- Glossary of property law terms.
- Letter of intent.
- Loss and expense.
- Payment for extra work.
- Remeasurement.
- Retention.
- Right to payment.
- The distinction between liquidated damages clauses and penalty clauses.
Featured articles and news
Life, death and art at the Stuart court. Book review.
Real estate, place adaptation and innovation.
Review and comment on the revised draft before July 11.
We are indeed now 10 years old, so go on and be bold !
Write about something you know, help us build and grow !
IHBC's 25th anniversary 2022 Aberdeen School.
A blended event and triumphant return.
New Construction Leadership Council Co-Chair selected.
Mark Reynolds succeeds Andy Mitchell as Co-Chair of CLC
Designing Buildings is 10 years old.
Types of work to existing buildings.
From alteration to deconstruction on DB.
Publication available
BSRIA Conference 2022, June 23.
Refurbishment for Net Zero.
In the sunshine things get hotter.
Understanding temperature in buildings on DB.
Giving power to the consumer on the road to net-zero.
A call for home energy management to be modernised.
How many different types can you think of ?
50th anniversary of the first Pride parade UK.
Looking back and fourth to what still needs to be done.
Cleaning up air quality and the Environment Act 2021.
Targets, impacts and action from ECA member.
Balkrishna Doshi wins Royal Gold Medal 2022.
Pioneering Indian environmental design Architect.
The greenest building is the one already built.
History of Temple Meads rewritten.
UK crying out for female tradespeople says CIOB research.
Currently standing at just 1%.
Find out more with BSRIA.
A cricket pitch is 1 chain long whilst 80 chains is a mile.
What is your pledge ?
Cabman shelters.
Changes come into force for F,L,O and S.
CIAT member reasons on why it matters.
Are there still ‘lessons to learn’ from Grenfell ?
Nine in ten civil engineers think so.
IHBC Annual School, 15-18 June.
The Jubilee® worm drive hose clip or Jubilee clip.
A trusted clip with a long history, worth celebrating.