Letter of appointment for consultants
Letters of appointment (or letters of acceptance, or letter contracts) are sometimes used to appoint consultants in cases when a client wants the consultant to start work quickly, while a full contract is being prepared.
The letter should put a time limit on its validity and make it clear a contract will supersede and replace anything expressed in the letter of appointment.
Ideally the letter should include:
- A brief description of the project.
- A scope of work to be undertaken.
- The fee (excluding VAT) to be paid within the time period, and when it is to be paid.
- Allowable expenses.
- The date for the start of work and the period covered by the letter.
- The right of the client to use material generated in the time period.
- A statement that the letter is an interim arrangement to be substituted by a contract.
- A statement that there is no guarantee to extend the appointment beyond the time period stated.
- The amount of professional indemnity insurance cover required for the project.
- The named staff or sub-consultants who will carry out the commission.
- The consultant’s reporting lines within the client organisation.
- A statement allowing termination of the agreement at will by either party, but with a fair proportion of the fee to be paid by the client as well as properly incurred and recorded expenses.
- A statement confirming that unresolved disputes will be settled by adjudication under English Law.
Letters of appointment may also be appropriate if a consultant is required for a very insubstantial or minor commission where a full-blown contract could be seen as heavy handed and off-putting. This also applies to small side-projects such as commissioning a sculpture from a particular artist. In such circumstances, many of the items listed above should be included in the letter, together with a programme and budget.
The appointment letter should be duplicated for the consultant’s retention and return. It should have an acceptance clause for the consultant’s signature at the end and the consultant should be asked to initial the foot of each page.
NB Contractors are treated slightly differently, using a letter of intent for temporary purposes prior to engrossment and execution of contract documents. See Letter of intent for more information.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..