Heating plant emission rate
According to the Domestic Building Services Compliance Guide published by HM Government in 2013, the term ‘Heating plant emission rate (HPER)’ refers to:
… the annual carbon dioxide emissions from fuel and power consumed by the heating plant, offset by the emissions saved as a result of any electricity generated by the heating plant, divided by the heat output over the year. It is measured in units of kg of carbon dioxide per kWh. To calculate HPER it is necessary to know the plant size ratio.
The plant size ratio (PSR) is the nominal heat output of the heating plant divided by the design heat loss (the average heat loss of the building on a cold day with a temperature differential of 24.2°C).
Note: The heating plant emission rate includes any auxiliary space and water heating that may be necessary, i.e. it represents the performance of all heating plant needed to provide space and water hating service to the building, assuming a standard demand pattern.
Note: For a given heat demand, the plant size ratio determines the part-load condition for the heating plant.
[edit] Related articles on Designing Buildings Wiki
- Building services compliance with the building regulations.
- Building services.
- Corrosion in heating and cooling systems.
- Domestic building services compliance guide.
- Gross calorific value.
- Heat pump.
- Heat recovery.
- Heating.
- Non-domestic building services compliance guide.
- Overheating.
- Radiant heating.
- Space heating system.
- Underfloor heating.
Featured articles and news
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.