Guide to good practice in the management of time in major projects: Dynamic time modelling
Delayed completion affects all project based industries in all countries, and the bigger the project, the more damage delayed completion causes to costs, reputation and even to the survival of the contracting parties themselves.
First published by the Chartered Institute of Building (CIOB) in 2010, the 'Guide to good practice in the management of time in major projects' sets a standard for time management in building and civil engineering projects. It is an integral part of the CIOB’s strategy to provide standards, education, training and accreditation in time management.
The latest (2nd) edition, published in February 2018, emphasises dynamic, strategic time modelling for the management of time and cost on major projects. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project, from inception to completion. It also includes new appendices covering matters such as complexity in construction and engineering projects, productivity guides and a number of case studies.
Keith Pickavance, author and past President of the CIOB said:
“On major projects the failure strategically to manage time so often proves disastrous, not just for the contractor but also for the client, its consultants, and for the rest of the supply chain.
“This guide is a step-by-step illustration of how the parties can work collaboratively to meet this challenge using traditional project procurement routes or the most advanced BIM, from the adoption of a workable time-management strategy through to the day to day detail of risk management, using a predictive time model.”
The publication is aimed at project and program management professionals working in civil engineering and construction projects, including those from contractors, clients and project management consultants.
For more information and to purchase this latest publication, visit Wiley.
--CIOB
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February
Update on the future of Grenfell Tower
Deputy Prime Minister decides for it be carefully taken down to the ground.
Ending decades of frustration, misinformation and distrust.
Essential tools in managing historically significant landscapes.
Classroom electrician courses a 'waste of money'
Say experts from the Electrical Contractors’ Association.
Wellbeing in Buildings TG 10/2025
BSRIA topic guide updates.
With brief background and WELL v2™.
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.