Gifts, bribes and kickbacks in the construction industry
Contents |
[edit] Introduction
A gift is an object, treat or sum of money given when appropriate as a token of thanks, celebration or appreciation, and with no expectation of a reciprocated reward: nothing is expected in return.
A bribe can involve giving a financial or other advantage in expectation of the recipient performing their function improperly and in a way that benefits the donor. Bribes attempt to curry favour and are regarded as unethical and are sometimes illegal. Bribes may be given to ‘grease the wheels of industry’ and often create conflicts of interest.
Recipients can determine whether something is a gift or bribe if they know what the expectation or purpose is. Where bribes are given, the value is usually irrelevant. What is important is the intent, and whether there is transparency.
In the UK, it is illegal to offer, promise, give, request, agree, receive or accept bribes – businesses can be protected by an anti-bribery policy, especially of they feel their employees may be exposed to bribes.
For more information see: Bribery Act.
[edit] An example
A buyer in a construction company may be given a lavish, no-expenses-spared day out at a sporting fixture by Company A. As a result, they subsequently offer Company A the contract to supply office lighting on a major office refurbishment.
The Bribery Act 2010 does not prohibit hospitality. However, even if the decision was made in earnest and Company A was indeed the most suitable supplier, the fact that the relationship existed may create the appearance of a conflict of interest. This may be partially overcome by showing full transparency in all such eventualities.
Generally, gifts should not be given during the tendering process, when negotiations are taking place or when a contract is being renewed. Thanking long-term customers is a common sentiment but it too can be perceived as a bribe. Companies must therefore be confident of why they are giving a gift and its timing.
Anti-bribery policies should include:
- The business’s approach to reducing and controlling the risks of bribery.
- Rules about accepting gifts, hospitality or donations.
- Guidance on how to conduct company business, e.g negotiating contracts.
- Rules on avoiding or stopping conflicts of interest.
[edit] Kickback
A kickback can be regarded as a backward bribe. For example, while a bribe may induce a party to be dishonest (i.e an inducement that is offered in advance of a state of affairs), a kickback occurs when a party gets money or some other reward after a state of affairs has materialised. An example would be a government official who approves a project and subsequently is rewarded by the project owner.
[edit] Related articles on Designing Buildings
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.























