Enhanced Capital Allowance scheme
Contents |
[edit] Inception
Enhanced Capital Allowance (ECA) legislation was introduced by the Government in 2001, creating a scheme that allowed businesses to write off the entire cost of any product included on the Energy Technology List (ETL) against taxable profits.
[edit] Closure
In October 2018, the Chancellor announced that the ECA and First Year Tax Credits Scheme (FYTC) would end from April 2020 for products on the ETL. This ETL publication has since been updated to remove references to the ECA.
[edit] Background
The aim of the scheme was to encourage businesses to invest in energy-saving plant or machinery included on the ETL, as well as low CO2 emission cars, natural gas and hydrogen refuelling infrastructure, and water conservation plant and machinery.
The Carbon Trust manages the ETL on behalf of the government. It is made up of two lists – the Energy Technology Criteria List (ETCL), which specifies the energy-saving performance criteria that scheme-qualifying equipment must meet, and the Energy Technology Product List (ETPL), which is a register of products that are compliant with the ETCL criteria.
By being able to write off the entire cost of equipment against taxable profits in the first year of its purchase, the scheme provides businesses with an incentive to invest in energy-saving equipment, as this can sometimes have a price premium compared to less efficient alternatives. In addition, it can provide businesses with a cash flow boost.
Find out more about the scheme: https://www.gov.uk/government/publications/enhanced-capital-allowance-scheme-for-energy-saving-technologies#full-publication-update-history
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
















