Engagement plan
Smart Building Overlay to the RIBA Plan of Work, published by the RIBA in 2024, defines an engagement plan as: ‘A written document outlining engagement scope, purpose, aim(s) and objectives, relevant policies, engagement study area, stakeholder engagement map and register, desktop study, appraisal of impact on protected characteristic groups. This may be developed alongside the project plan and updated throughout the project as necessary.’
Engagement Overlay to the RIBA Plan of Work, published by the RIBA in January 2024, states in relation to engagement plans:
The engagement lead creates a written document in conjunction with the project brief and consistently reviews it throughout the project. The insights extracted from the engagement plan guide the procedural aspects of the project and contribute to the evolution of the design at every stage of the work.
- Preliminary engagement plan: Overall engagement scope, purpose, aim(s) and objectives, relevant policies, engagement study area, stakeholder engagement map and register, desktop study, appraisal of impact on protected characteristic groups. Related to RIBA Work Stage 0.
- Engagement plan: Review the stakeholder engagement map; define the scope of the engagement; review purpose, aim(s) and objectives. Define language and terms of reference for engagement, determine the measurement of success, engagement methods, register of participants, financial aims and limitations and engagement outcomes.
[edit] Related articles on Designing Buildings
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.





















