Electromagnetic lock
An electromechanical lock is a 'mechanical locking device with electrical control of components or linkages e.g. solenoid or motor lock' in comparison to for example a locking device with electric control of it main elements such as maglock.(Code of practice: Hardware for fire and escape doors, Issue 5, published by DHF and GAI in November 2024)
Such a lock works by creating a magnetic field when supplied with electricity or powered up, causing the electromagnet and armature plate to become very strongly attracted to one other in order to keep a door firmly shut and preventing opening until the power supply is adjusted. This is a different approach to for example an electromechanical lock which is mechanical locking device with electrical control of it components or linkages such as a solenoid or motor lock.
[edit] Related articles on Designing Buildings
- Access control.
- Digital door lock market.
- Doors.
- Entry control.
- External doors..
- Fire Door Inspection Scheme.
- Fire door.
- Fire Doors (DG 524).
- Fire.
- Grenfell tower.
- Hinge.
- Home security solutions market.
- How door locks work.
- Installing fire doors and doorsets (GG 86).
- Intumescent strip.
- Mortice lock.
- Mortise vs mortice.
- Noise - doors and windows.
- Outbuildings security.
- Perimeter security.
- Protected door.
- Self-closing device.
- Security and the built environment.
- Security glazing.
- Smoke control door.
- Sneck.
- Types of alarm.
- Types of door
- Types of lock.
- Width of doors stairs and escape routes.
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.