Design build finance and operate
An example of a design build finance and operate procurement route is a public private partnership (PPP), the most common form of which is a private finance initiative (PFI) project (ref. HM Treasury Public private partnerships).
A single contractor (perhaps a special purpose vehicle (SPV), with design, construction and facilities management expertise as well as funding capability) is appointed to design and build the project and then to operate it for a period of time. The contractor finances the project and leases it to the client for an agreed period (perhaps 30 years) after which the development reverts to the client.
As this is a very long-term relationship, entered into before any design work is undertaken, it is extremely important that the client defines their requirements very carefully, in particular the quality that is required and how it will be judged. A great deal of risk is given to the contractor, however the price they offer will reflect this.
PFI is one of the three procurement routes favoured by the Government Construction Strategy for central civil government projects.
Variations include: design build operate (DBO), and build, own, operate, transfer (BOOT).
In 2011, two government reports concluded that PFI contracts have not been a good use of taxpayers money, suggesting that PFI cost five times more than conventional government procurement. The banks, funding institutions and professions have not been prepared to take the risk associated with PFI projects, and it has instead been transferred to the building contractors and operating companies which have offered high prices in return.
The attraction to government is that PFI projects do not appear on the balance sheet, albeit piling up debt in the public sector with as much as twenty five year commitments. The recommendation of the reports is that in future PFI liabilities should be shown on treasury accounts. This may reduce this type of government contracting in the future.
For a detailed description of the sequence of activities necessary on a PFI contract see the free work plan: Public project: outline work plan.
[edit] Related articles on Designing Buildings Wiki
- Build, own, operate and transfer (BOOT).
- Design and build.
- Design and build - pros and cons.
- Design, build, finance, maintain DBFM.
- Design Build Finance Operate Maintain DBFOM.
- Design Build Finance Transfer (DBFT).
- Design build operate (DBO).
- Design Build Operate Transfer DBOT.
- Design construct manage finance DCMF.
- Government Construction Strategy.
- Infrastructure UK.
- PF2.
- Procurement route.
- Private Finance Initiative.
- Public Private Partnership.
- Public procurement.
- Renovate, operate, transfer (ROT).
[edit] External references
HM Treasury PFI / PPP guidance. 25 July 2013.
Featured articles and news
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
Comments