Adhesive anchors
Structural Fixings for Ductwork Systems BG 10/2010, By Glenn Hawkins, Published by BSRIA in 2010, states in relation to the working principles of structural fixings: ‘Bonding is the working principle of adhesive anchors. An adhesive bond is formed between the metal anchor and the hole wall by a synthetic resin. The curing of the resin is characterised by two critical times: Gel (or open) time: The time from the end of mixing to when the insertion of the anchor into the bonding materials should take place. Curing time: The minimum time from the end of mixing to when the anchor may be torqued or loaded. In addition to hole depth, hole diameter and anchor embedment depth, hole cleanliness is a key criteria that affects performance of these fixings.’
--BSRIA
[edit] Related articles on Designing Buildings
- Adhesive.
- Bolts.
- Bonding.
- BSRIA articles.
- BSRIA definitions.
- Building services.
- Clamp.
- Cramp.
- Crimp.
- Fixing v fastener.
- Fixings.
- Nails.
- Screws.
- Strap.
- Welding.
Featured articles and news
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.