User contributions
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
- 18:46, 26 October 2011 (diff | hist) Concept design report
- 18:39, 26 October 2011 (diff | hist) N Concept design report (Created page with "The final output of the concept design stage is to produce a report which record the basic design concepts that might be options worth further investigation focusing on the major...")
- 18:34, 26 October 2011 (diff | hist) N Concept design (Created page with "NB for detailed tasks undertaken during the concept design stage see the free work plans available from the home page. Concept design is the first design stage. Feasibility stud...")
- 17:49, 26 October 2011 (diff | hist) Traditional contract: business justification
- 15:00, 26 October 2011 (diff | hist) N Category:Design (Created page with "Category:Design")
- 14:59, 26 October 2011 (diff | hist) N Concept architectural design checklist (Created page with "Concept architectural (as opposed to concept structural design or concept services design) design should take the development of the design to a level where it is suffi...")
- 14:50, 26 October 2011 (diff | hist) N Category:Planning permission (Created page with "Category:Regulations") (top)
- 14:49, 26 October 2011 (diff | hist) N Community infrastructure levy CIL (Created page with "In 2010 measures within the [http://www.legislation.gov.uk/ukdsi/2010/9780111492390/contents community infrastructure levy regulations ]came into force clarifying the relationshi...")
- 14:40, 26 October 2011 (diff | hist) N Commissioning building systems (Created page with "Commissioning refers to the process of bringing an item into operation and ensuring that it is in good working order. On building projects, this usually refers to building servic...")
- 14:35, 26 October 2011 (diff | hist) Collateral warranties for building design and construction
- 14:26, 26 October 2011 (diff | hist) Traditional contract: business justification
- 14:22, 26 October 2011 (diff | hist) N Collateral warranties for building design and construction (Created page with "#Collateral warranties are agreements associated with another 'primary' contract. They came into being as a result of the courts deciding that defects in buildings were not recov...")
- 14:18, 26 October 2011 (diff | hist) Traditional contract: business justification
- 14:16, 26 October 2011 (diff | hist) N Traditional contract: business justification (Created page with "NB there is no equivalent RIBA stage as business justification takes place before the appointment of an architect. The business justification stage is the first stage to take pl...")
- 13:59, 26 October 2011 (diff | hist) Arbitration in the construction industry
- 13:58, 26 October 2011 (diff | hist) Arbitration in the construction industry
- 13:57, 26 October 2011 (diff | hist) Adjudication in construction contracts
- 13:55, 26 October 2011 (diff | hist) Traditional contract: outline work plan
- 13:52, 26 October 2011 (diff | hist) Traditional contract: outline work plan
- 13:42, 26 October 2011 (diff | hist) Get started - top tips and help
- 13:41, 26 October 2011 (diff | hist) N Get started - top tips and help (Created page with "= = = How to create an article. = <br>formatting might change on import<br>Locked out<br>How to edit an article.<br>Locked out = <br>Creating links. = <br>Wiki sites work be...")
- 13:34, 26 October 2011 (diff | hist) N Collaborative practices for building design and construction (Created page with "The establishment of collaborative practices is of particular importance on building design and construction projects as they are likely to involve the bringing together of a lar...")
- 13:22, 26 October 2011 (diff | hist) Base date in construction contracts
- 13:17, 26 October 2011 (diff | hist) Building user's guide
- 13:13, 26 October 2011 (diff | hist) Change control procedure for building design and construction
- 13:08, 26 October 2011 (diff | hist) Appointing consultants for building design and construction
- 13:04, 26 October 2011 (diff | hist) N Category:Other legislation (Created page with "Category:Regulations") (top)
- 13:03, 26 October 2011 (diff | hist) Alternative dispute resolution for construction ADR
- 12:58, 26 October 2011 (diff | hist) N Change control procedure for building design and construction (Created page with "Changes to a design may have impacts on time, cost or quality. Broadly, the later in the development of the project that changes occur, the greater those impacts are likely to be...")
- 12:51, 26 October 2011 (diff | hist) Appointing consultants for building design and construction
- 12:45, 26 October 2011 (diff | hist) Champions for construction clients
- 12:39, 26 October 2011 (diff | hist) Champions for construction clients
- 12:37, 26 October 2011 (diff | hist) Champions for construction clients
- 12:36, 26 October 2011 (diff | hist) Champions for construction clients
- 12:36, 26 October 2011 (diff | hist) Champions for construction clients
- 12:35, 26 October 2011 (diff | hist) N Champions for construction clients (Created page with "It is important on all projects that there are designated client 'champions' On public sector projects, the Office of Government Commerce (OGC) recommend early appointment of a ...")
- 12:27, 26 October 2011 (diff | hist) N Certificate of making good defects (Created page with "Once practical completion has been certified, the defects liability period begins (now called the 'rectification period' in JCT contracts). Typically, the defects liability perio...")
- 12:21, 26 October 2011 (diff | hist) N CDM co-ordinator (Created page with "Under the CDM Regulations (The Construction (Design and Management) Regulations 2007), A CDM co-ordinator must be appointed on projects that last more than 30 days or involve 500...")
- 12:14, 26 October 2011 (diff | hist) N 2007 CDM Regulations (Created page with "The Construction (design and management) regulations (2007) (CDM Regulations) are intended to ensure that healt...")
- 12:04, 26 October 2011 (diff | hist) N Client's representative (Created page with "Some procurement systems such as the British Property Federation (BPF) system define the role of client’s representative. This is the person responsible for managing the pro...")
- 11:07, 26 October 2011 (diff | hist) Client for building design and construction
- 11:06, 26 October 2011 (diff | hist) Client for building design and construction
- 11:05, 26 October 2011 (diff | hist) Client for building design and construction
- 11:02, 26 October 2011 (diff | hist) Client for building design and construction
- 10:56, 26 October 2011 (diff | hist) Client for building design and construction
- 10:50, 26 October 2011 (diff | hist) Client for building design and construction
- 10:44, 26 October 2011 (diff | hist) N Client for building design and construction (Created page with "The client here refers to the organisation that is procuring the building development. This client is sometimes referred to as the employer as they are the organisation that empl...")
- 10:32, 26 October 2011 (diff | hist) N File:Client1.jpg (OGC illustration of project organisation) (top)
- 10:19, 26 October 2011 (diff | hist) N Cash flow in construction (Created page with "The cash flow sets out when costs will be incurred and how much they will be during the life of the project. <br>Predicting the cash flow that will be required is important in ...")
- 10:16, 26 October 2011 (diff | hist) Capital allowances for construction
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
Featured articles and news
A resource for Cleaner Air, Better Tomorrow.
Awe-inspiring medieval great barns.
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.