Statement of need for building design and construction
The client's statement of need is part of an ongoing process of defining their requirements:
The statement of need describes the client's possible requirements in outline, which at this stage may or may not result in the need for a project. It may include the following information:
- A description of the business need that may result in a project.
- An assessment of how it will contribute to the corporate strategy.
- An analysis of the high level options (such as do something, do nothing, new build, extend, refurbish, relocate, change the way the organisation works, etc.).
- A description of the nature of the client, and its history.
- A description of the nature of client's operations.
- Information about existing premises and likely future requirements.
- The assumed budget (and the basis for the budget).
- The assumed programme.
- An assessment of the potential for future changes.
The statement of need is likely to be in a report format, however, where possible, information and requirements should be scheduled in a database or spreadsheet that will be easy to expand and will be easy to use to test whether proposals satisfy requirements later in the project.
If independent client advisers are to be appointed to assist with preparing a more detailed 'strategic brief' and to assess the feasibility of the proposed project, the nature of their role and scope of services may be based on the project description in the statement of need.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.