Topping out
The term ‘topping out’ refers to the installation of the final piece of structure, or the completion of the roof on a building, bridge or other large construction. It signifies that the structure has reached its maximum height (not that the project has reached completion). In the UK, topping out may be marked by the installation of a plaque or other feature recording the occasion and is often used as a PR event for the media.
The significance of topping out is believed to date back to pre-Dark Age Scandinavia, where folklore suggests there was a practice of placing a tree on top of a new building to appease the tree dwelling spirits of their displaced ancestors. This became a celebration as large numbers of the community would often assist with completing a new building, and it was a way the building owner could show their appreciation. The Scandinavian invaders of the mid-to-late 8th century, introduced the practice to England.
In 14th century England, topping out ceremonies were marked by a yew tree branch being placed at the highest point of the building. Such occasions were included in the writings of the poet Geoffrey Chaucer. Often the personal flag of the owner would be hoisted on top of the building once the shell was complete.
In modern construction, topping out ceremonies are celebrated in different ways around the world:
- Jordan: Builders hold a religious ceremony followed by a feast.
- Denmark: The roof of the building is decorated with evergreen garlands.
- America: The final structural piece is often painted white and signed by members of the construction team.
- Germany: Laurels are hung around the chimney of a new house to acknowledge its ‘birth’.
- Brazil: Branches and leaves are fixed to the building.
- Spain: A flag is raised and all workers are invited to a lunch by the boss.
Media representatives are often present at topping out ceremonies on major projects, invited to attend in order to generate interest in the project, as well as celebrate its progress and the achievement of the construction team.
|
| Prime Minister Tony Blair at the topping out ceremony for the Millennium Dome on 22 June 1998. |
[edit] Related articles on Designing Buildings
- Activity schedule.
- Ceremony.
- Certificate of non completion.
- Completion.
- Completion date.
- End of stage report for construction.
- Final certificate.
- Key dates.
- Handing over possession of the construction site to the contractor.
- Handover to the client.
- Milestones.
- Practical completion.
- Programme for building design and construction.
- Scheduling construction activities.
- Sectional completion.
Featured articles and news
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.

























Comments
Very nice article. I only wished for a picture of the tree in the top of the Scandinavian construction, since it might be an outstanding image!