Wire rope suspension systems
Contents |
[edit] Introduction
Historically, cable management and support systems have been installed in the same way for decades. It is a system that works, but it's one which often results in over engineered containment with far too many brackets holding up very little cable and a lot of fresh air. However, by utilising the standards and working on manufacturers loading information it is possible to reduce the volume of steel required.
[edit] Standards
IEC 61537:2006, The Cable Tray and Ladder Standard, provides the manufacturer with information on fixing centres and testing methods for containment under load. This results in each manufacturer having load graphs which show what weight their products can carry at varying fixing centres.
Power cables are frequently installed on tray and ladder systems in such a way that it is normal to see 75% of the tray or ladder empty on long runs with the bending radius of the cable being accommodated on a large bend section. Potentially the long straight runs could easily be reduced in size, thereby reducing the volume of steel significantly. The difference in weight between ladder sizes is around 10-15%.
[edit] Related articles on Designing Buildings Wiki
[edit] External resources
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.