Total quality management in construction
Total quality management (TQM) is a theory of management the purpose of which is to improve an organisation’s ability to deliver quality to its customers on a continuously improving basis.
There are several differences between TQM and a traditional management system. TQM is a process-oriented as opposed to a result-oriented approach, and prioritises quality, flexibility and services rather than cost and technical efficiency. TQM involves a more horizontal organisational structure rather than the traditional vertical management structure. TQM presumes that profits follow quality and not vice versa.
As a philosophy, TQM is more associated with manufacturing and service industries, although has also been applied to construction as clients increasingly demand a high standard of delivery for large and complex buildings.
Although in construction, delays and defects can arise that are unavoidable, far more so than in a more controlled manufacturing environment, the application of TQM requires that the employee’s mindset be shifted from one of just monitoring to continually looking for opportunities to make improvements. TQM can be applied in construction as a way of approaching the conception, visualisation and achievement of goals to ensure quality and productivity, with an emphasis on innovation and new technology.
While there is no standard method of applying TQM, there are a number of typical elements:
- The customer is the ultimate user, and wants a quality product at a reasonable price.
- Feedback from customers should be analysed and implemented where necessary.
- Top management should lead well with vision and commitment.
- Employees should be encouraged and rewarded for good performance.
- Training should be provided regularly to upgrade the skills of employees.
- Conflicts should be avoided, and teams should work in unison toward a common goal.
The basic steps in implementation of TQM are as follows:
- The client should give a commitment regarding quality.
- A project quality assurance plan should be prepared for all work levels.
- A process approach should be developed toward TQM.
- Employees should be made aware of, and educated about TQM.
- Employee involvement should be promoted and encouraged.
- Steps should be taken to ensure continuous improvement can be made.
- Quality plans and performance should be measured and reviewed.
Some of the benefits that can be derived from TQM include; reduction in quality costs, higher levels of employee and client satisfaction, less remedial work, fewer delays, and a closer relationships with subcontractors and suppliers.
A major limitation of TQM is the time and resources required to establish the correct environment and organisational culture.
[edit] Related articles on Designing Buildings Wiki
- Commercial management.
- Construction management: outline work plan.
- Improving quality in the built environment.
- Leadership styles.
- Lean construction.
- Pareto analysis.
- Performance management plan.
- Plan, Do, Check, Act (PDCA).
- Project quality plan PQP.
- Quality control.
- Quality in construction projects.
- Quality manuals and quality plans.
- Ten principles for procuring better outcomes.
- Value management.
Featured articles and news
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Ebenezer Howard: inventor of the garden city. Book review.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.