Third party opinion and fixed-fee mediation procedures
Contents |
[edit] Introduction
Construction contracts usually provide for disputes to be dealt with by agreed dispute resolution procedures involving mediation, adjudication and arbitration. Often a combination of all three.
On 6 November 2014, The RIBA launched two new dispute resolution schemes intended as alternatives to more formal processes:
- Third party opinion.
- Fixed-fee mediation.
These are fast, low-cost schemes intended for the resolution of low-level disputes that might otherwise cause delays to projects.
[edit] Third party opinion
The third party opinion procedure is intended for the resolution of technical issues or issues such as valuation. It involves the selection of an independent professional to give an opinion on the dispute and to make a recommendation for settlement. It is appropriate where the parties genuinely wish to settle the dispute and is entered into by consent, it is not part of the contract terms.
Submissions are limited to the two sides of A4 form each party with a maximum of 10 sides of supporting documents. A 5 hour time limit is applied. If a settlement is reached, the parties sign a binding agreement. The procedure may be abandoned at any time.
[edit] Fixed-fee mediation
The fixed-fee mediation procedure is intended for low-value disputes (up to £15,000) that the parties have a genuine wish to settle, and which can be resolved quickly. Mediators are selected from a list maintained by the RIBA to assist negotiations between the parties. If a settlement cannot be reached by negotiation, the mediator may suggest a settlement, but this is only binding if the parties wish it to be. If a settlement is reached, the parties sign a binding agreement. Mediation may be abandoned at any time.
The parties each set out the nature of the dispute on a single side of a A4. Mediation is conducted by telephone for no more than an hour. There can be one or two hours of preparation depending on the amount in dispute.
[edit] Related articles on Designing Buildings Wiki
- Adjudication.
- Alternative dispute resolution legislation.
- Arbitration.
- Breach of contract.
- Causes of construction disputes.
- Conciliation.
- Contract claims.
- Dispute resolution boards.
- Expert witness.
- Housing Grants, Construction and Regeneration Act.
- Litigation.
- Mediation.
- Med-adjudication.
- Med-arbitration.
- RIBA.
- Scheme for Construction Contracts.
Featured articles and news
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.