Third party opinion and fixed-fee mediation procedures
Contents |
[edit] Introduction
Construction contracts usually provide for disputes to be dealt with by agreed dispute resolution procedures involving mediation, adjudication and arbitration. Often a combination of all three.
On 6 November 2014, The RIBA launched two new dispute resolution schemes intended as alternatives to more formal processes:
- Third party opinion.
- Fixed-fee mediation.
These are fast, low-cost schemes intended for the resolution of low-level disputes that might otherwise cause delays to projects.
[edit] Third party opinion
The third party opinion procedure is intended for the resolution of technical issues or issues such as valuation. It involves the selection of an independent professional to give an opinion on the dispute and to make a recommendation for settlement. It is appropriate where the parties genuinely wish to settle the dispute and is entered into by consent, it is not part of the contract terms.
Submissions are limited to the two sides of A4 form each party with a maximum of 10 sides of supporting documents. A 5 hour time limit is applied. If a settlement is reached, the parties sign a binding agreement. The procedure may be abandoned at any time.
[edit] Fixed-fee mediation
The fixed-fee mediation procedure is intended for low-value disputes (up to £15,000) that the parties have a genuine wish to settle, and which can be resolved quickly. Mediators are selected from a list maintained by the RIBA to assist negotiations between the parties. If a settlement cannot be reached by negotiation, the mediator may suggest a settlement, but this is only binding if the parties wish it to be. If a settlement is reached, the parties sign a binding agreement. Mediation may be abandoned at any time.
The parties each set out the nature of the dispute on a single side of a A4. Mediation is conducted by telephone for no more than an hour. There can be one or two hours of preparation depending on the amount in dispute.
[edit] Related articles on Designing Buildings Wiki
- Adjudication.
- Alternative dispute resolution legislation.
- Arbitration.
- Breach of contract.
- Causes of construction disputes.
- Conciliation.
- Contract claims.
- Dispute resolution boards.
- Expert witness.
- Housing Grants, Construction and Regeneration Act.
- Litigation.
- Mediation.
- Med-adjudication.
- Med-arbitration.
- RIBA.
- Scheme for Construction Contracts.
Featured articles and news
£52bn of projects awarded to top 50 firms in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.