The Gateway, Buckinghamshire New University

RMJM were appointed by Buckinghamshire New University (BNU) in 2006 to lead a design team to progress the consolidation of their existing campuses to the Queen Alexandra Road campus in High Wycombe.
Phase 1 of this project represents a new landmark building to accommodate a learning resource centre, a multi-purpose hall, computing teaching space, specialist space for music, drama, dance and multimedia, gymnasiums, a lecture hall, a main reception, supporting administration, social and recreational space on a constrained and sensitive urban site. The vision was to create a sustainable and contemporary building that provides facilities for the whole student body and which contrasts with the existing campus architecture to establish a new and distinctive identity for the University.

The exciting mix of uses reinforces the public nature of the campus and, when combined with the 24/7 access, creates a memorable and appropriate ‘gateway’ building for BNU and High Wycombe consequently raising the expectations and experiences of students, staff and public alike.
The project was tendered through a two-stage design and build procurement route with RMJM novated to lead the selected contractor’s design team. The building was opened to students in September 2009.
Photos © Hufton & Crow
Featured articles and news
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.