Ripping ground
In relation to civil engineering, the term ‘ripping’ refers to the loosening of soil, rock or frozen ground by drawing a forked or pronged implement through it.
Ripping (or deep ripping / deep tillage) is also used in agriculture to break up ground for crop planting.
Ripping can be carried out by tractors with rear-mounted rippers or by simple ripper or ‘blade’ attachments for excavators that can provide an alternative to hydraulic breakers.
A 'subsoiler' is similar to a ripper but often with wings on the foot of the tines to increase soil heave and shatter. Ref The HS2 London-West Midlands Environmental Statement, Glossary of terms and list of abbreviations, DETR 2013.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.