Procurement Bill to mandate prompt payment
The Cabinet Office leads on how the Government spends some £300bn of public funds annually. It is currently navigating the post-Brexit Procurement Bill – which will shape how the public sector buys goods, services and works - through Parliament, on the way to it becoming law.
ECA’s Rob Driscoll Chairs the Cabinet Office Payment Advisory Group. This Group has been raising high level awareness that, while current UK enactment of EU law states tiers 1, 2 and 3 should be paid in 30 days under public sector contracts, there has been no reliable way of knowing if this really happens. However, following a meeting with Ministers Baroness Neville-Rolfe and Brendan Clarke-Smith MP this month, Rob Driscoll advises that the forthcoming Bill now includes provisions to establish 30-day payment within the public sector by:
- ensuring 30-day payment will be a mandatory implied term into tier 1, 2 and 3 construction contracts – overriding any other payment terms within relevant contracts (widely regarded as a milestone achievement); and
- requiring public sector procurers to report on their payment performance in the same way as the private sector.
Should the new provisions be enacted as currently proposed, non-compliance would then be dealt with by the Public Procurement Review Service, supported by the Small Business Commissioner.
This article first appeared on the ECA news and blog site under the same title dated October 14, 2022.
--ECA
[edit] Related articles on Designing Buildings
- Connected procurement.
- Difference between procurement and purchasing.
- European Single Procurement Document ESPD.
- Maintenance Repair Operations MRO.
- Procurement policy.
- Procurement route – frequently asked questions.
- Procurement strategy.
- Public procurement.
- Renovate, operate, transfer (ROT).
- Subcontract procurement.
- Transforming Public Procurement Green Paper.
- Two-stage tender.
- What is the most common procurement route?
Featured articles and news
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.