Metal furring system
The term 'metal furring system', or MF system, refers to a non-structural metal attachment that is used to hold a finish material, often used as a technique for creating a seamless plaster internal finish with a void behind for the installation of services, with plasterboard fixed directly to the concealed metal furrings. It can be used as an alternative to traditional timber batten construction for walls and ceilings.
In metal-framed construction, the furring pieces are long, light gauge materials (usually 25 or 20 ga.) of various shapes, often used to hold insulation or other construction items between materials. Due to the light gauge, a certain amount of rigidity is provided by the bends that create the cross section shapes.
A ‘hat’-shaped bent metal is the most common type of metal furring. This is used to secure the outer layer of material where it would be difficult to insert attachments such as screws and nails.
A ‘z’ furring is attached to one surface at the bottom flange, accepting an outer layer of material to be attached to the other flange. This is often used in commercial and residential buildings as a spacer, allowing an existing wall surface to be insulated, or allowing horizontal electrical or plumbing components to be installed and covered with a finish material.
A variety of fastening methods can be used with a metal furring system. Screws are the most common and easiest, although when the furring strip is attached directly to concrete, masonry or structural steel, more specialised fasteners are used such as sleeve type anchors, course thread anchors, power actuated pin fasteners, and so on.
[edit] Related articles on Designing Buildings
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.