Golden thread index
This article provides an index of key articles about the golden thread, with regards to building information in particular building safety. For more detail about the golden thread, a full definition and related articles, see our main golden thread of building information article.
The term golden thread has previously used in relation to the Soft Landings framework, post occupancy evaluation and building performance evaluation referring to a chronological set of information, often building performance related, running throughout the design process through to completion and as part of building handover process.
More directly in relation to building safety, the term golden thread first appeared in the interim report into the Review of Building Regulations and Fire Safety which was published in December 2017. In the report Dame Judith Hackitt said following the Grenfell Tower Fire: “There needs to be a golden thread for all complex and high-risk building projects so that the original design intent is preserved and recorded, and…any changes go through a formal review process involving people who are competent and who understand the key features of the design."
This was further iterated in Final Report Building a Safer Future, Independent Review of Building Regulations and Fire Safety published in May 2018, with a focus on higher risk residential buildings (HRRBs). In the final government response to the ‘Building a Safer Future’ consultation
The Government response to the ‘Building a Safer Future’ consultation was A reformed building safety regulatory system published by the Ministry of Housing, Communities and Local Government in in April 2020 it states:
"Duty-holders will be responsible for creating and maintaining the golden thread of building information related to fire and structural safety. The golden thread will be held digitally to ensure that the original design intent and any subsequent changes to the building are captured, preserved and used to support safety improvements. At the handover stage between Gateway three and occupation, key information (the golden thread) will have to be handed over from the Client to the Accountable Person - both will need to confirm that this has happened. The Accountable Person will continue to be responsible for the golden thread and ensuring the information remains accurate and up to date."
The concept of the golden thread has become a key element to the significant changes that have been brought about by the Building Safety Act and its supporting regulations.
Key articles relating to the golden thread of building information on this site include:
- 2017 Soft Landings Conference.
- Fire safety design.
- Flammable building materials.
- Golden Thread report published by CIOB and i3PT.
- Golden thread factsheet.
- Golden thread guidance to be published by BSA.
- Golden Thread Report - BRAC.
- Gateways in building design and construction projects.
- Hackitt report on Grenfell Tower from the ACA.
- Procurement after Grenfell.
- Soft landings.
- The golden thread and BS 8644-1.
- University of East Anglia - case study.
Featured articles and news
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.