Construction project complexity
Improving Infrastructure Delivery: Project Initiation Routemap, Handbook, Version 2 June 2016, published by the Infrastructure and Projects Authority, states: ‘Project complexity is a measure of the inherent difficulty of delivering a project based on factors such as stakeholder alignment; interconnectedness of projects; systems & organisations and the level of innovation required etc. The Routemap uses the Delivery Environment Complexity Assessment (DECA) published by the NAO for complexity assessment.’
Project Routemap, Setting up projects for success, Organisational Design & Development, UK Module, published by the Infrastructure and Projects Authority in 2021, states: ‘In the context of Routemap, project complexity is a measure of the inherent difficulty of delivering a project. This is assessed on factors such as the stability of the wider delivery environment, the level of innovation required, and the number of stakeholders involved.’
ICMS: Global Consistency in Presenting Construction Life Cycle Costs and Carbon Emissions, 3rd edition, November 2021, published by the ICMS (International Cost Management Standard) Coalition, defines Project Complexity as: ‘The relative intricacy of a Project or Sub-Project by reference to its form, design, site constraints, method or timing of construction, renewal, operation, maintenance or end of life activities.’
Cost prediction, Professional Statement, 1st edition, published in November 2020 by the Royal Institution of Chartered Surveyors (RICS), defines complexity as: ‘The number of elements, their interactions and the strength of impacts on a defined system with regard to decision making, project control and predictable asset delivery.’
See also: Complexity theory and Complex project.
[edit] Related articles on Designing Buildings
Featured articles and news
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description fron the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
























Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.