Payment is the transfer between parties of some form of value (such as funds, services, assets) in an agreed exchange. This can be for goods, services or to fulfil a legal obligation such as a debt. The most common form of payment involves money although it can also take the form of other benefits, and is typically preceded by a bill or invoice specifying the amount due.
An advance payment, sometimes referred to as a down payment, or ex gratis payment, is when part of a contractual sum is paid in advance of the exchange, i.e. before any work has been done or goods supplied. Advance payments are typically recorded as prepaid expenses by the payer and recorded as assets on the balance sheet.
On a construction project, a contractor may request an advance payment to help them meet significant start up or procurement costs that may have to be incurred before construction begins. For example, where they have had to purchase high-value plant, equipment or materials specifically for the project. In these instances, the client should require an advanced payment bond. This secures the payment against default by the contractor.
For more information, see Advance payment bond.
It is also sometimes necessary for the client to pay for items even though they remain ‘off-site’, for example, where a contractor has made a large payment for plant or materials that have yet to be delivered to site, or if the client wishes to ‘reserve’ key items in order to protect the programme. However, this does put the client at risk, for example if the contractor or supplier becomes insolvent and the items are then not delivered, even though payment has been made.
Several mechanisms are available to protect the client, however, none of these is fool proof. Judgement is necessary to assess the risk to the project, or the potential loss to the client versus the benefit of greater certainty of supply.
For example, a ‘vesting certificate’ or ‘certificate of vesting’ may be required from the contractor (or sub-contractors or suppliers), certifying that ownership of goods, plant or materials listed in a schedule will transfer from one party to the other upon payment and confirming that they will be will be properly identified, separately stored, insured and are free from encumbrances (such as retention of title).
For more information see: Off site materials.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.