Supplier inputs process outputs and customers
Construction Quality Planning Guide, Draft for Consultation, Published by the Construction Innovation Hub in May 2020, describes Supplier, Inputs, Process, Outputs and Customers (SIPOC) as: ‘A tool from six sigma that provides a tabular summary of the inputs to outputs of one or more processes, known as a SIPOC diagram. Some organisations refer to it as COPIS in order to put the emphasis on customer requirements.’
[edit] Related articles on Designing Buildings Wiki
- Advanced product quality planning.
- Bill of quantities breakdown structures.
- Construction Innovation Hub.
- Construction product approval process.
- Construction quality planning.
- Plan, Do, Check, Act (PDCA).
- Poka-yoke.
- Product Breakdown Structure.
- Product design requirements.
- Product validation.
- Production readiness review.
- Project quality plan.
- Quality control.
- Quality in construction projects.
- Quality.
- Six Sigma.
Featured articles and news
Prioritising tax considerations.
Reviewing the Double Diamond Design model
The four D creative process: discover, define, develop and deliver.
National Cyber Security Centre initiative is announced.
The impact of COVID-19 on global HVAC&R markets
Reviewing trends and projections.
Legislation will establish initiatives to move towards net zero.
Status determination statement
How to document contractor employment status.
Social distancing goes high tech
Tech tools to help manage people and space post-pandemic.
Eclectic Edwardian architecture
A style that ranges from mock Tudor to arts and crafts to the 'Wrenaissance'.
Free guide from Secured by Design.
Building Back Better: Circularity
BREEAM strategy for sustainability and the circular economy.
Free tool to improve the construction programming process.
Building services verification
Are buildings doing what they're supposed to be doing?
Cities with quick access to everything by foot or bike.
The pressures and pinch points of global destinations.