Solar hot water panels
Heritage Building Retrofit Toolkit, published by the City of London Corporation in March 2024, describes solar hot water panels as panels that: ‘Absorb the heat of the sun and transfer it to the water used in a building. Not to be confused with photovoltaic panels which convert sunlight into electricity.’
See also: Solar thermal systems.
[edit] Related articles on Designing Buildings
- Definitions of retrofitting.
- Fabric first.
- Heritage.
- How to deal with retrofit risks.
- LETI publishes Climate Emergency Retrofit Guide.
- National Retrofit Strategy NRS.
- Renovation v refurbishment v retrofit.
- Retrofit.
- Retrofit and traditional approaches to comfort.
- Shallow retrofit.
- Solar thermal systems.
- Step-by-step retrofit.
Featured articles and news
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.





















