Reasons to Specify a Geomembrane Liner Instead of Natural Clay
Contents |
[edit] Introducing liners
When designing a pond or lagoon, preventing leaks is a major concern. However, determining the best geomembrane liner for your project can be an extremely daunting task. You have to decide between reinforced and unreinforced geomembranes, which material and thickness is best, and between a myriad of other physical properties that could play a part in the success of your project. As a result, people often times choose a natural clay liner because it is the less complicated choice.
That being said, natural clay can be a detriment to your pond or lagoon. In some instances, geomembrane liners are installed over the original natural clay after the clay has failed.
[edit] Reasons why geomembranes are the superior liners
[edit] 1. Geomembrane Liners Are More Affordable
When it comes to affordability, there are many factors beside product costs that need to be taken into consideration. Installing natural clay is a difficult and time-consuming process that can cost you much more in labor fees than if you were to install a geomembrane. Natural clay can also be rather expensive to transport to the installation site.
The real cost of a liner system has several components other than material cost. These include costs related to installation, maintenance, repair, longevity of product, terms of warranty, and liability exposure.
[edit] 2. Geomembrane Liners Are More Impermeable
When a pond or lagoon is lined, the goal is to achieve an impermeable containment system. This liner system will prevent hazardous liquid from contaminating and coming in contact with the soil’s water table. Leaks can occur with any material, however, they are much less likely to happen when a geomembrane is specified.
Pond liner is an impermeable geomembrane used for the retention of liquids. Most geomembrane liners are engineered to have an impermeability range of at least 1 x 10-10 to as low as 1 x 10-14, while natural clay can have an impermeability of less than 1 x 10-7. Natural clay is also more susceptible to leaks due to the installation process. Natural clay installations must take into account the following considerations to minimise leakages:
- The slope of the pond or lagoon
- How evenly the natural clay must be spread
- What type of soil the natural clay is being spread on
- The exact chemical makeup of the natural clay
Regardless, the natural clay may have to be reinstalled several times over the years to prevent leaks from occurring or continuing to get worse.
[edit] 3. Geomembrane Liners Have a Proven Track Record
Many geomembrane manufacturers have been in business for at least 30 years and as a result, have proven results for their products. These geomembrane manufacturers will be able to provide you with in-depth knowledge and guidance on pond/lagoon liner applications that you will not necessarily receive from a natural clay provider. The different expert levels comes from the fact that natural clay is not specified as often for lagoons and ponds, so the natural clay providers have less real-life experience. This can be hazardous to your project and budget down the line if a failure occurs with the natural clay.
Overall, geomembrane liners are superior to natural clay when it comes to pond and lagoon liner applications. If you have any specific questions about geomembrane cost, strength, durability, or durability, or would like to discuss your geomembrane project, feel free to contact one of our geomembrane experts.
--Ecogeox
[edit] Related articles on Designing Buildings
Featured articles and news
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description fron the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.