Concrete boom pumps
This artilce needs more work. To help improve this article click 'Edit this article' above.
Contents |
[edit] Introduction
What follows is a set of some of the important factors that should be considered before conducting a search for a concrete boom pump.
[edit] Volume of pumping
Pumping volume or pumping capacity is one of the most significant parameters for this investment. Fortunately, these pumps can be purchased in the huge range of pumping capacity but you need to understand the theoretical capacity is likely to be on the higher side in relation to real-world conditions. The makers mention ideal pumping capacity - which is tested in standard testing conditions - but this may not match real world conditions. It is best to keep a margin of 10% to 20% when calculating or comparing pumping capacity based on the specifications distributed by the maker.
[edit] Quality of materials
A concrete boom pump is an expensive purchase. It should last several years. Its service life depends, to some extent, on the quality of materials used for making the pump. Components made from lower quality alloys may fail much sooner than expected, resulting in additional investment in repairs and replacement components.
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.
Historic England and infrastructure
New projects offer opportunities for the historic environment and local communities.
Construction Management, 2 June
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.