Party Wall Surveyor Costs
To help develop this article click 'Edit this article' above.
All building owner party wall surveyor fees and agreed party wall surveyor fees should be fixed and never include any hidden extras charges.
They might be, for example in 2020 as outlined below, 2024 prices maybe up to 30% higher so seek an estimate:
- Party Wall Notice Fees from £65.00 +VAT (2020)
- Schedule of Condition Report Fees from £450.00 +VAT (2020)
- Party Wall Agreement Fees from £950.00 +VAT (2020)
Party wall surveyor’s hourly rates ranged from £80 to £275 + VAT per hour in 2020, however, this is not to say that applying a full £275 + VAT hourly rate to the entire job is reasonable, as this would see the building owner paying far to high a fee. A reasonable party wall surveyor will only apply their full hourly rate to the actual party wall aspects of the job. In 2024 hourly rates can vary from between £90 to £450.
Administration time, such as printing, filing, creating files etc should be on a far lower hourly rate, this logic also applies for the time spent undertaking a schedule of condition.
Schedules of conditions can often take 1-3 hours depending on the size of the property and the level of the defect, an adjoining owner’s party wall surveyor on a 2020 hourly rate of £275 + VAT could therefore easily rack up a fee of £1000 + VAT when taking account travel. In 2024 this might be nearer £1,500 - £2,000 and as much as £5,000 for complex structures, it is recomended to get two or three estimates before proceeding with any work.
This could be deemed unreasonable, a good building owner’s party wall surveyor would be able to competently deal with an issue.
Party wall surveyor costs may vary as property type varies. For example:
- Houses
- Flats
- Commercial
- Hotels
- Legal Experience
- Rear and Side Extensions
- Loft Conversions
- Basement Conversions
- High-Risk Works
[edit] Related articles on Designing Buildings
- Adjoining buildings definition.
- Appointing consultants.
- Basement excavation.
- Building an extension.
- Fence.
- Line of junction notice.
- Load-bearing wall.
- Neighbour.
- Party structure notice.
- Party wall act.
- Party wall surveyor.
- Preventing wall collapse.
- Responsibility for boundary features.
- Right of support.
- Statutory approvals.
- Statutory authorities.
- Trespass.
- Wall types.
- What approvals are needed before construction begins.
IHBC NewsBlog
UK Stained Glass Repository finds windows new homes
How are stained glass windows are rescued, stored and repurposed?
APPGEBE report sets high aims for quality
'Government must not sacrifice quality in drive to build 1.5m homes'
New measures protect Historic Shipwrecks from heritage crime
Underwater cultural heritage benefits from new HE guidance
How could the City of London skyline look in 6 years' time?
Visualisation shows approved planning applications as completed buildings
National Trust for Scotland calls for VAT cuts
Heritage neglect is encouraged by current policies
IHBC's 'Context' Issue 186 features Industrial Heritage
IHBC's members' journal reports on the challenges of conserving infrastructure.
Book now for IHBC Annual School 2026
IHBC Annual School is taking place 18-20 June 2026 in Newcastle.
RICHeS Research Infrastructure offers ‘Full Access Fund Call’
RICHeS offers a ‘Help’ webinar on 11 March
Latest IHBC Issue of Context features Roofing
Articles range from slate to pitched roofs, and carbon impact to solar generation to roofscapes.
Three reasons not to demolish Edinburgh’s Argyle House
Should 'Edinburgh's ugliest building' be saved?
IHBC’s 2025 Parliamentary Briefing...from Crafts in Crisis to Rubbish Retrofit
IHBC launches research-led ‘5 Commitments to Help Heritage Skills in Conservation’
How RDSAP 10.2 impacts EPC assessments in traditional buildings
Energy performance certificates (EPCs) tell us how energy efficient our buildings are, but the way these certificates are generated has changed.