Not right first time
Construction Quality Planning Guide, Draft for Consultation, Published by the Construction Innovation Hub in May 2020, suggests that Not Right First Time (NRFT) refers to: ‘The first measure under the QCD (Quality, Cost and Delivery) approach to improved production performance, it measures a product’s ability to match a specification. It is typically expressed in ‘number of defect parts per million’ with a defective unit defined as one that does not conform to specification and may be scrapped or reworked.’
QCD: measuring manufacturing performance, Published by the Department of Trade and Industry in 2004 suggested that Not Right First Time (NRFT) measures a product’s ability to match a specification and is expressed in number of defect parts per million.
Not right first time = 10^6 X (Quantity of defective units / Total quantity of units supplied)
NRFT can be measured internally and externally in the production cycle:
- Internally – defective units identified within the production process.
- Externally – defective units that are identified outside the production process, either from the supplier or at the customer’s site.
A defective unit is a unit that does not conform to specification and may be scrapped or reworked.
[edit] Related articles on Designing Buildings
Featured articles and news
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.